My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
401
>
2900 - Site Mitigation Program
>
PR0505260
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:18:45 PM
Creation date
4/13/2020 1:06:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505260
PE
2950
FACILITY_ID
FA0005154
FACILITY_NAME
FEDERAL BUILDING/US POST OFC
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13915005
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From:09MI dela Tare To: Mary Ways Date:6126% TIme:1124t20 Page 3 of <br /> Stockton Federal Building Tank Removal <br /> On-Site Meeting <br /> Project No.: RCA21521 <br /> Contract No.: GS09P94KTC000070 <br /> June 21, 1995 <br /> Page 2 <br /> 1.09 Mary was concerned that.the use of pea gravel as a backfill material would contribute to the <br /> migration of contamination. Abide indicated that the gravel was a temporary fill to avoid a safety <br /> problem both to the building and the street. Eventually the fill would be removed and replaced <br /> by engineered,compacted soil fill as part of the permanent remedial measures to be taken later. <br /> 1.10 Mary showed concern that a registered geologist was not on-site during excavation. Clemens <br /> indicated they did not contract for one since they were not given a modification to include this <br /> service in their contract. <br /> 1.11 Mary asked that the test.results under both tanks be submitted to her office with a.summary report <br /> that included an analysis of the data and conclusions. A qualified firm must be used to generate <br /> this report. Two weeks was assigned for this task and was due to her office by 7/5195. GSA will <br /> contact Cape Environmental to arrange this. Abide will forward the test results to Cape as soon <br /> as the results for tank 2 are submitted by Clemens. Kevin turned the test results for tank 1 over <br /> to Darril. <br /> 1.12 GSA will also discuss with C e Environmental the need to have a phase two assessment work <br /> plan done. Mary work plan detailing the exact procedures for conducting the <br /> assessment b4X <br /> 4- scd he SvnMci{ecQ lob- g.t{. .5 <br /> 1.13 Mary stated that her office is sensitive to the-.e� sts for remediation efforts at this site. She <br /> did not want to see costs rise to unrealistic or inappropriate levels on any reme iati��roject. <br /> 1.14 Mary responded to Ando's question about the length of time-she-" monitoring L,)aS <br /> cenduc� e , <br /> ahs s4u+ed fv .t Gt t1�1V�1Y►k�r✓1 c�uc,�f-(.� w•pll^S ec.a tii-5 ate.e i�e ,uc✓ <br /> The foregoing conveys our understanding of items discussed and decisions reached during this meeting. <br /> We assume our understanding to be correct unless notice to the contrary is brought to our attention. �y <br /> Prepared: Abide International,Inc. <br /> Signed: <br /> Date: June 23, 1995 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.