Laserfiche WebLink
From:09MI dela Tare To: Mary Ways Date:6126% TIme:1124t20 Page 3 of <br /> Stockton Federal Building Tank Removal <br /> On-Site Meeting <br /> Project No.: RCA21521 <br /> Contract No.: GS09P94KTC000070 <br /> June 21, 1995 <br /> Page 2 <br /> 1.09 Mary was concerned that.the use of pea gravel as a backfill material would contribute to the <br /> migration of contamination. Abide indicated that the gravel was a temporary fill to avoid a safety <br /> problem both to the building and the street. Eventually the fill would be removed and replaced <br /> by engineered,compacted soil fill as part of the permanent remedial measures to be taken later. <br /> 1.10 Mary showed concern that a registered geologist was not on-site during excavation. Clemens <br /> indicated they did not contract for one since they were not given a modification to include this <br /> service in their contract. <br /> 1.11 Mary asked that the test.results under both tanks be submitted to her office with a.summary report <br /> that included an analysis of the data and conclusions. A qualified firm must be used to generate <br /> this report. Two weeks was assigned for this task and was due to her office by 7/5195. GSA will <br /> contact Cape Environmental to arrange this. Abide will forward the test results to Cape as soon <br /> as the results for tank 2 are submitted by Clemens. Kevin turned the test results for tank 1 over <br /> to Darril. <br /> 1.12 GSA will also discuss with C e Environmental the need to have a phase two assessment work <br /> plan done. Mary work plan detailing the exact procedures for conducting the <br /> assessment b4X <br /> 4- scd he SvnMci{ecQ lob- g.t{. .5 <br /> 1.13 Mary stated that her office is sensitive to the-.e� sts for remediation efforts at this site. She <br /> did not want to see costs rise to unrealistic or inappropriate levels on any reme iati��roject. <br /> 1.14 Mary responded to Ando's question about the length of time-she-" monitoring L,)aS <br /> cenduc� e , <br /> ahs s4u+ed fv .t Gt t1�1V�1Y►k�r✓1 c�uc,�f-(.� w•pll^S ec.a tii-5 ate.e i�e ,uc✓ <br /> The foregoing conveys our understanding of items discussed and decisions reached during this meeting. <br /> We assume our understanding to be correct unless notice to the contrary is brought to our attention. �y <br /> Prepared: Abide International,Inc. <br /> Signed: <br /> Date: June 23, 1995 <br /> I <br />