Laserfiche WebLink
CLEMENS CONSTRUCTION CO. <br /> P.O. Box 494639 Redding, California 96049 <br /> (916) 223 - 6593 <br /> General Engineering Contractor <br /> Stockton Federal Building, San Joaquin and Lindsey, Stockton <br /> Contract Number GS-09P-94-KTC-0070/0912-94-2-01227 <br /> Remove Underground Storage Tanks at the Stockton Federal Building, Stockton, CA <br /> Plan Prepared 4/24/95 <br /> The Work Plan <br /> Introduction: <br /> Clemens Construction Co.'s work plan for underground storage tank(UST)removal will be <br /> implemented and controlled through the chain of command outlined in the Safety and Accident <br /> Prevention Plan. The work plan defines the tasks and objectives as well as the operations, <br /> logistics and resources required for safe removal of UST's. The plan is outlined as follows: Site <br /> Preparation, Tank Preparation, Tank Removal and Sampling. <br /> Related Plans <br /> CCC IIPP - Clemens Construction Co.'s Injury Illness Prevention Plan. <br /> UST Removal Safety and Accident Prevention Plan- Concentrates on hazards related to UST <br /> removal. <br /> Site Specific Safety Plan and Work Plan(SSSPWP) -.Reviews site specific hazards and <br /> conditions, and more stringent local regulations. <br /> In case of conflicts between these plans, the more stringent shall apply. <br /> Site Preparation <br /> Review site safety plan. <br /> Federal, State and Local laws, codes, ordinances and regulations which <br /> apply to the work shall be rigidly followed. <br />