My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
401
>
2900 - Site Mitigation Program
>
PR0505260
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:11:33 PM
Creation date
4/13/2020 1:08:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505260
PE
2950
FACILITY_ID
FA0005154
FACILITY_NAME
FEDERAL BUILDING/US POST OFC
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13915005
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEMENS CONSTRUCTION CO. <br /> P.O. Box 494639 Redding, California 96049 <br /> (916) 223 - 6593 <br /> General Engineering Contractor <br /> Stockton Federal Building, San Joaquin and Lindsey, Stockton <br /> Contract Number GS-09P-94-KTC-0070/0912-94-2-01227 <br /> Remove Underground Storage Tanks at the Stockton Federal Building, Stockton, CA <br /> Plan Prepared 4/24/95 <br /> The Work Plan <br /> Introduction: <br /> Clemens Construction Co.'s work plan for underground storage tank(UST)removal will be <br /> implemented and controlled through the chain of command outlined in the Safety and Accident <br /> Prevention Plan. The work plan defines the tasks and objectives as well as the operations, <br /> logistics and resources required for safe removal of UST's. The plan is outlined as follows: Site <br /> Preparation, Tank Preparation, Tank Removal and Sampling. <br /> Related Plans <br /> CCC IIPP - Clemens Construction Co.'s Injury Illness Prevention Plan. <br /> UST Removal Safety and Accident Prevention Plan- Concentrates on hazards related to UST <br /> removal. <br /> Site Specific Safety Plan and Work Plan(SSSPWP) -.Reviews site specific hazards and <br /> conditions, and more stringent local regulations. <br /> In case of conflicts between these plans, the more stringent shall apply. <br /> Site Preparation <br /> Review site safety plan. <br /> Federal, State and Local laws, codes, ordinances and regulations which <br /> apply to the work shall be rigidly followed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.