My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
401
>
2900 - Site Mitigation Program
>
PR0505260
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:11:33 PM
Creation date
4/13/2020 1:08:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505260
PE
2950
FACILITY_ID
FA0005154
FACILITY_NAME
FEDERAL BUILDING/US POST OFC
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13915005
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> _Equipment Inspection and/Maintenance mss' <br /> r <br /> The proper maintenance of equipment is essential for both safety and <br /> production. the following is a summary of our Equipment Inspection and <br /> Maintenance Program: <br /> • Owned equipment is under a PM program and is inspected regularly, deficiencies <br /> corrected. Rental equipment vendors are instructed to inspect equipment prior to <br /> transportation to the job site. Rental equipment is again inspected when it arrives <br /> on the project. Inspections are documented. <br /> • Back-up alarms, roll over protection, seat belts and brakes will be inspected at <br /> start up by the operator. Deficiencies will be corrected before the machine is put <br /> in use. <br /> • All operators shall be qualified to operate the machines on which they are assigned. <br /> Hazardous Materials <br /> All hazardous materials brought onto the project site for use on the project <br /> will be accompanied by a Materials Safety Data Sheet, (MSDS). <br /> Employees will be notified as to where the MSDS'S can be found and <br /> taught to read them. <br /> Subcontractor Compliance <br /> Subcontractors and material suppliers shall comply with all applicable j <br /> provisions in this plan, the work plan, the site safety plan, the IIPP and all <br /> OSHA regulations. Where conflict between standards and codes arise, the <br /> most stringent rule shall apply. Enforcement shall be through the following <br /> methods: <br /> I <br /> • A legally signed contract or purchase order with the appropriate verbiage binding <br /> the aforementioned to utilize the proper safety standards. <br /> • An orientation before the beginning of their work or material delivery, and a total <br /> jobsite walk-thru making them aware of what other potentially hazardous <br /> construction work is going on around them. <br /> • Inspections conducted by the project manager and superintendent, to ensure that <br /> the procedures and methods outlined in this plan and the IIPP are followed. <br /> I, <br /> P <br /> i <br /> i <br />`3 <br /> ii <br /> 1 <br /> Fi <br /> 1 <br /> j <br />
The URL can be used to link to this page
Your browser does not support the video tag.