Laserfiche WebLink
Spill Prevention Control and Countermeasure Plan <br /> Food Express, Inc. <br /> 1250 Madruga Road <br /> FOOD EXPRESS,TINC. Lathrop, California 95330 <br /> May 2020 <br /> Page 4 <br /> • Additional preventative measures taken or contemplated by the facility to minimize the <br /> possibility of recurrence; and <br /> • Any other information as the USEPA may reasonably require pertinent to the SPCC Plan <br /> or discharge(s). <br /> In addition to the Federal regulation, State of California Office of the State Fire Marshal regulates <br /> oil spills under California Health and Safety Code (H&SC) Section 25507 (Regulation Reference <br /> 3). <br /> SPCC PLAN MANAGEMENT APPROVAL & REVIEW - <br /> [PREAMBLE 112.71 <br /> SPCC PLAN AMENDMENTS <br /> This SPCC Plan will be amended whenever there is a change in the facility design, construction, <br /> operation, or maintenance that materially affects the facility's potential for a discharge of oil into <br /> or upon navigable waters. Such amendment will take place within six months of the change and <br /> be implemented at the facility as soon as possible, but not later than six months after the SPCC <br /> Plan has been amended. Examples of changes that may require amendment of this SPCC Plan <br /> include, but are not limited to [40 CFR §112.5(a)]: <br /> • Commissioning or decommissioning of oil storage containers; <br /> • Reconstruction, replacement, or movement of oil storage containers; <br /> • Reconstruction, replacement, or installation of oil-containing piping; <br /> • Construction or demolition that alters secondary containment structures; <br /> • Changes of product or service; or <br /> • Revision of standard operation or maintenance procedures related to oil handling or oil <br /> storage. <br /> In accordance with 40 CFR §112.5(c), any technical amendment to this SPCC Plan must be <br /> certified as being prepared in accordance with good engineering practice, and considering <br /> applicable industry standards, by a licensed Professional Engineer in accordance with 40 CFR <br /> §112.3(d). <br /> In accordance with 40 CFR §112.5(b), if no required amendments based upon the above criteria <br /> have occurred for five (5) years from the previous amendment, the entire SPCC Plan must be <br /> reviewed, evaluated, and updated as necessary to ensure the use of current and effective <br /> discharge (spill) prevention technology. <br /> =ATe Page 4 <br />