My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADRUGA
>
1250
>
2800 - Aboveground Petroleum Storage Program
>
PR0515716
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:48:42 PM
Creation date
4/14/2020 10:52:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515716
PE
2832
FACILITY_ID
FA0009618
FACILITY_NAME
FOOD EXPRESS INC
STREET_NUMBER
1250
Direction
E
STREET_NAME
MADRUGA
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
24141028
CURRENT_STATUS
01
SITE_LOCATION
1250 E MADRUGA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Control and Countermeasure Plan <br /> Food Express, Inc. <br /> 1250 Madruga Road <br /> FOOD EXPRESS, INC. Lathrop, California 95330 <br /> dEb du May 2020 <br /> Page 5 <br /> SPCC PLAN MANAGEMENT APPROVAL <br /> In accordance with 40 CFR §112.7, this SPCC Plan has the full approval of management at a <br /> level of authority to commit the necessary resources for its full implementation. <br /> Authorized Facility Michael Collins <br /> Representative: <br /> Title: Terminal Manager <br /> Signature: <br /> SPCC PLAN MANAGEMENT REVIEW [112.5(6)1 <br /> In accordance with 40 CFR §112.5(b), the facility's management will complete a review and <br /> evaluation of this SPCC Plan at least once every five years. The facility's management will amend <br /> this SPCC Plan within six months of the review to include more effective prevention and control <br /> technology if: (1) such technology will significantly reduce the likelihood of a discharge event from <br /> the facility and (2) if such technology has been field-proven at the time of review. Such <br /> amendment will be implemented at the facility as soon as possible, but no later than six months <br /> following the amendment to this SPCC Plan. The review and evaluation must be documented <br /> below and noted whether or not this SPCC Plan will be amended: <br /> By my signature below, I document that I have completed a review and evaluation of this SPCC <br /> Plan and have noted below if this SPCC Plan will or will not be amended as a result. <br /> DATE AMENDMENTS' SIGNATURE <br /> ' In accordance with 40 CFR§ 112.5(c), any technical amendment to this SPCC Plan will be certified by a <br /> Professional Engineer in accordance with 40 CFR§ 112.3(d). <br /> Apr <br /> ATe Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.