My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADRUGA
>
1250
>
2800 - Aboveground Petroleum Storage Program
>
PR0515716
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:48:42 PM
Creation date
4/14/2020 10:52:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515716
PE
2832
FACILITY_ID
FA0009618
FACILITY_NAME
FOOD EXPRESS INC
STREET_NUMBER
1250
Direction
E
STREET_NAME
MADRUGA
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
24141028
CURRENT_STATUS
01
SITE_LOCATION
1250 E MADRUGA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Control and Countermeasure Plan <br /> Food Express, Inc. <br /> 1250 Madruga Road <br /> Lathrop, California 95330 <br /> FOOD EXPMRESS. wc. <br /> May 2020 <br /> Page 27 <br /> 16.0 REQUIRED ACTIONS <br /> 16.1. REQUIRED SIGNATURES <br /> Upon receiving your copy of the SPCC, management is required to review and sign designated <br /> places within the SPCC. <br /> 16.1.1. SPCC PLAN MANAGEMENT APPROVAL <br /> The SPCC regulations requires the facility management understands the responsibilities and <br /> implications of storing and handling quantities of oil that required completion of a SPCC and <br /> pledge sufficient company resources to take on the responsibilities and implications. <br /> Consequently, the SPCC is not considered valid unless the SPCC PLAN MANAGEMENT <br /> APPROVAL signature block on page 5 is completed and dated. <br /> 16.1.2. CERTIFICATION OF SUBSTANTIAL HARM CRITERIA CHECKLIST [40 CFR <br /> 112.20(F)(1)] <br /> To avoid needing to complete a complex Facility Response Plan" (FRP) management is required <br /> to review the Certification of Substantial Harm Checklist (Appendix A) and sign it, if appropriate. <br /> 16.2. PLAN AMENDMENTS AND REVIEW [40 CFR§112.5(A,B&C)]: <br /> SPCC Plan review is required every 5 years by management and plan amendments are required <br /> as part of implementing this plan. These requirements can be found in the Introduction Section of <br /> this Plan. <br /> 16.3. NOTIFICATION OF DISCHARGES [40 CFR§112.7 (A)(4)]: <br /> Notification of discharges is required as part of implementing this plan. Notification of discharge <br /> requirements can be found in Section 3 of this Plan and Spill/Release Notification forms for <br /> recording discharges are included in Appendix C. <br /> 16.4. MANAGEMENT PLAN APPROVAL [40 CFR §112.7]: <br /> Management approval is required as part of implementing this plan. Management approval <br /> requirements can be found in the Introduction Section of this Plan and requires the complete <br /> review and signature authorization by management. <br /> 16.5. VISUAL INSPECTIONS [40 CFR §112.7(E)]: <br /> The SPCC regulations require visual inspections as part of implementing this plan. Visual <br /> inspection requirements can be found in Section 5 of this Plan and recordkeeping forms for visual <br /> inspections are included in Appendix D. <br />
The URL can be used to link to this page
Your browser does not support the video tag.