Laserfiche WebLink
SPCC Plan - Spill Prevention Briefing <br /> Branch <br /> Facility: Name Manager <br /> Address <br /> Date of Briefing: <br /> Briefing Conducted By: <br /> The following items were discussed at the meeting: <br /> (Check items discussed) <br /> X SPCC rules and regulations <br /> X Spill events or failures at this or other facilities <br /> X Operation and maintenance of equipment to prevent oil spills <br /> X General spill prevention, spill response and SPCC inspections I <br /> X Spill reporting procedures <br /> X Contents of this SPCC Plan <br /> Other: <br /> Other: <br /> Comments: <br /> Personnel in Attendance: <br /> Printed Name Signature <br /> 1. <br /> 2. I <br /> 3. I <br /> 4. I <br /> 5. I <br /> 6. I <br /> 7. I <br /> 8. <br /> 9. <br /> 10. <br /> Note:The briefing report should be kept with the SPCC Plan for three years. <br /> Copy this original for use during briefings. <br />