Laserfiche WebLink
California Regional Water Quality Control-Board <br /> Central Valley Region� <br /> Robert Scbneicier.Cbsir <br /> erry Tamminen � Arnold Schwarzenegger <br /> Secretary for Sacramento Main Office Governor <br /> Environmental Internet Address ht0.lwww swrcb ca pvlrwgcb5 RECEIVE[ <br />' Protection 11020 Sun Center rhnve#200 Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 OCT 0 5 2004 <br />' 4 October 2004 <br /> Mr Bob Hopkins Mr Jay Allen <br /> Union Oil Company of California Stone Brothers Management Company <br /> 276 Tank Farm Road 1024 W Robinhood Dr <br /> P O Box 1069 Stockton,CA 95207 <br /> San Luis Obispo, CA 93406 <br /> LETTER REQUEST, CLEANUP AND ABATEMENT ORDER (CAO)NO. 5-00-707;FOR2i ER UNOCAL <br />' STATION#5098 AT 5606 PACIFIC AVENUE,AND FORMER MONTGOMERY WARDS AUTO SERVICE <br /> AT 5400 PACIFIC AVENUE,STOCKTON,SAN JOAQUIN COUNTY, <br /> Regional Board staff reviewed the 15 September 2004 Request for Extension to Restart SVE System and <br /> Evaluation of Potential Enhancement to SVE System(Letter), submitted by Unocal The Letter proposes a date <br /> of 15 January 2005 for submitting a report recommending a proposal for enhancement to the existing SVEIAS <br /> system,to help cease plume movement <br /> Background My letter dated 15 May 2004 requested a Workplan by 15 June 2004,to comply with <br /> CAO No 5-00-707,Order No 15,which states "If groundwater monitoring indicates that the groundwater <br /> plume has migrated beyond laterally or vertically defined limits during the quarter, the quarterly report shall <br /> include a workplan and schedule, with work to begin within 30 days of a report submittal, to define the new <br /> plume limits and cease plume movement The Workplan,received 15 June 2004,did not include a schedule to <br /> beam woik to redefining the limits of the groundwater plume within 30 days A Notice of Violation(NOV) for <br /> CAO No 5-00-707 was issued on 18 June 2004 The NOV required implementation of the approved Workplan <br /> by 15 July 2004, and also required submittal of a Report by 1 August 2004,showing the steps taken to cease <br /> plume movement You did comply with both NOV deadlines by installing the monitoring wells and providing <br /> the Report,which redefined the limits of the groundwater plume and began the process for restarting the SVE/Air <br /> Sparging system On 14 June 2004,the Air Sparging(AS)system was overhauled and restarted The SVE <br /> system required a new air permit, and was scheduled to start by 15 September 2004 The Soil Vapor Extraction <br /> (SVE) system was restarted on 28 September 2004,per email notification received from your consultant ENSR <br /> International Inc (ENSR) Additionally,in a phone discussion on 3 September 2004, ENSR proposed enhancing <br /> the SVFJAS remediation by Iii-Situ Chemical Oxidation, specifically Ozone Injection Since additional time <br /> would be required to evaluate an injection of an In-Situ Chemical Oxidation substance,I suggested that ENSR <br /> begin the process by providing a baseline analysis using site soil and groundwater,prior to submitting a <br /> Workplan for a bench scale testing for ozone injection A pilot study for ozone injection into the aquifer would <br /> also be necessary ENSR provided email copies of the preliminary baseline analyses on 28 September 2004 <br /> I concur to the proposed 15 January2005 deadline to provide a Report of the assessment of SVE/AS <br /> enhancement,pm-ided the following due elates are met <br /> o By 15 October 2004, submit a Workplan outlining the entire process for enhancement to the existing <br /> SVE/AS system,to help cease plume movement Also,I have reviewed existing data and request <br /> inclusion of additional-monitoring wells needed to enhance-the vertical and lateral extent of <br /> contaminants Specifically, adequate characterization is needdd t6-show groundwater flow direction and <br /> California Environmental Protection Agency <br /> g�Recycled Paper <br />