My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ' V\L <br /> Advanced GeoEnvironmqntal Inc. =o- <br /> of Northern Ccd fvrnia 7 <br /> 31 July 1997 <br /> AGE-NC Project No. 95-0103 <br /> Mr. Russell Chapin <br /> CHAPIN BROTHERS INC. <br /> 1203 North Carlton Avenue <br /> Stockton, California 95203 <br /> Subject: Soil Vapor Extraction Unit Operation - Status Update <br /> CHAPIN BROTHERS INC. <br /> 1766 Monte Diablo Avenue, Stockton, California <br /> Dear Mr. Chapin: <br /> In accordance,with your request,we are providing the following update concerning the operation of <br /> the SVE unit at the subject site: <br /> • The SVE unit has experienced continual operation on a stand alone basis; however, when <br /> hydrocarbons vapors are added into the operation of the unit, a shutdown occurs. AGE has <br /> been in contact with the unit manufacturer (King-Buck Technology). Verbal <br /> recommendations and suggestions from the manufacture have been implemented and, thus <br /> far, unsuccessful. <br /> • Based upon our conversations with the previous operator of the SVE unit, it does not appear <br /> that a refurbishing was performed prior to delivery at the Chapin site. <br /> • A cost breakdown for additional verbal technical advice and field services provided by King- <br /> Buck was sent to your office. <br /> • AGE has contacted the Underground Storage Tank Cleanup Fund (USTCF) to notify Mr. <br /> Mel Jacobo of the present status and lack of performance of the SVE unit. Based upon our <br /> conversation, the USTCF has agreed to have the unit inspected by King-Buck and, if <br /> possible, proceed with a limited amount of repairs. AGE requested a cost pre-approval for <br /> the inspection and repair. <br /> • .The estimated cost to be incurred for the field inspection is $1,500. This services includes <br /> a field inspection of the SVE unit. Repairs will likely be required, based on the poor <br /> operation of the unit. If practical, the USTCF has also approved an additional $1,500 in <br /> repairs and/or parts replacement costs. <br /> 1803 West March Lane,Suite A,Stockton,California 95207 <br /> Telephone(209)956-0264 FAX(209)956-0700 <br />
The URL can be used to link to this page
Your browser does not support the video tag.