My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brooke Birkie -2- February 21, 2001 <br /> Claim No. 8492 <br /> tasks and costs are necessary and reasonable. Unfortunately, if costs exceed the pre-approval <br /> amounts, Fund staff will be unable to expedite your reimbursement request associated with this pre- <br /> approval. <br /> • The work products must be acceptable to the County and Regional Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs on the <br /> new scope of work. <br /> • Although I have referred to the Foothill Engineering proposal in my pre-approval above, please be <br /> aware that you will be entering into a private contract: the State of California cannot compel you to <br /> sign any specific contract. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before <br /> you will be reimbursed. Please insure that your consultant prepares their invoices to inchide the <br /> required break down of costs on a time and materials basis, that invoiced tasks are consistent with the <br /> original proposal, and that reasonable explanations are provided for any changes made in the scope of <br /> work or increases in the costs. When the invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County and Regional Board. <br /> Please call if you have any questions; I can be reached at(916) 341-5674. <br /> Sincerely, " <br /> --fre4vsr 4 <br /> Wennilyn Fua, ater Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: Mr. Michael Infurna <br /> San Joaquin County PHS-EHD <br /> ,% P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> California Eo vironmeatal Protection Agency <br /> .fl <br /> :a Recyc%d Pepe <br />
The URL can be used to link to this page
Your browser does not support the video tag.