My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Ater Resources Contro Board r,'o <br /> Division of Clean Water Programs . o" <br /> Winston H. Hickox 1001 1 Street•Sacramento,California 95814•(916)341-5674 <br /> Mailing Address: P.O.Box 944212•Sacramento,Califomia•94244-2120 Gray Davis <br /> SecreraryJor FAX(916)341-5806•Internet Address: http://www.swrcb.ca.gov/cwphome/ustef <br /> En vL onmentnl Governor <br /> Protection <br /> February 21, 2001 <br /> Mr. Russell Chapin <br /> Chapin Brothers, Inc. <br /> 1203 E Carlton Ave. <br /> Stockton, CA 95203 <br /> PRE-APPROVAL Or CORRECTIVE ACTION COSTS, CLAIM NO. 557 <br /> SITE ADDRESS: 1766 MONTE DIABLO AVE, STOCKTON, CA <br /> I have reviewed your request, received on February 6, 2001, for pre-approval of corrective action <br /> costs; I will place these documents in your file for future reference. I have included a copy of the <br /> "Cost Pre-Approval Request" form; please use this form in the future for requesting pre-approval <br /> of corrective action costs. <br /> With the following provisions, the total cost pre-approved as eligible for reimbursement <br /> conducting a groundwater extraction feasibility pilot test and drilling of 3 soil probe borings in <br /> accordance to the December 15, 2000 and January 15, 2001 Advanced GeoEnvironmental, Inc. <br /> workplan and workplan addendum approved by the San Joaquin County PHS-EHD on January <br /> 16, 2001, is $21,295. Please refer to the table on the next page for a breakdown of costs. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: necessary (as <br /> determined by the Fund) corrective action costs for corrective action work directed and <br /> approved by the County and Regional Board will be eligible for reimbursement at costs <br /> consistent with those pre-approved in this letter. However, depending on what happens in the <br /> field, some costs may not actually be necessary. If the Fund agrees that they were in fact <br /> necessary, the Fund will reimburse at reasonable rates (rates consistent with those pre-approved.) <br /> In order for future costs for corrective action to be part of the expedited reimbursement <br /> processes they must be pre-approved in writing by Fund staff and must meet the requirements <br /> of Article 11, Chapter 16, Underground Storage Tank Regulations. <br /> California Eo vironmeatal Protection Agency <br /> a Recycled Rep- <br />
The URL can be used to link to this page
Your browser does not support the video tag.