My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Russell Chapin -2- February 21, 2001 <br /> Claim No. 557 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task Amount Pre-Approved Comments <br /> I Planning&permitting $270 <br /> 2 Probing and sampling $2,330 <br /> 3 Laboratory analysis $1,700 <br /> 4 Includes disposal of 15,000 gal of waste <br /> water at$0.35/gal. Reimbursement of <br /> Aquifer pumping tests $14,G90 disposal cost will be based on the actual <br /> volume disposed. <br /> 5 Data analysis/report $2,205 <br /> preparation <br /> TOTAL PRE-APPROVED $21,295 <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. Only the tasks/costs reflected on the above are pre-approved at this time. <br /> The Fund will review any tasks/costs that go beyond the pre-approved amount to determine if <br /> the additional tasks and costs are necessary and reasonable. Unfortunately, if costs exceed <br /> the pre-approval amounts, Fund staff will be unable to expedite your reimbursement request <br /> associated with this pre-approval. <br /> • The work products must be acceptable to the County and Regional Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Advanced GeoEnvironmental, Inc. proposal in my pre- <br /> approval above, please be aware that you will be entering into a private contract: the State of <br /> California cannot compel you to sign any specific contract. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required break down of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County and Regional Board. <br /> CaGforaia Ea viroameatal Frotection Agency <br /> Za Recycled Pepe <br />
The URL can be used to link to this page
Your browser does not support the video tag.