My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:28:03 PM
Creation date
4/15/2020 2:17:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapin Brothers Page 3 <br /> 1766 Monte Diablo May 21, 2009 <br /> Stockton, CA <br /> 8/12/93 The date of the EHD letter documenting notification of three feet of free product <br /> being found in MW1 and requiring removal of the free product. <br /> 8-9/93 Free product was removed from MW1 on 8/16/93, 8/19/93 and 9/2/93. The <br /> amount had been reduced to 1.2 inches. <br /> 12/27-29/93 Dates that monitoring wells MW2, MW3, MW4 and vapor well VW1 (borings B2 — <br /> B5) were installed. <br /> 3/29-30/94 Borings, B6 through B6, were drilled during this time. <br /> 05/12/94 A pump test was performed on MW1 on this date. <br /> 06/10/94 A vapor extraction test was conducted and vapor wells VW2, VW3 and VW4 <br /> were installed on this date. VW1 could not be used because of poor vacuum so <br /> the test was performed on VW3. <br /> 7/22/94 The date of Problem Assessment Report that details the work performed during <br /> March through June 1994 and recommends using vapor extraction with <br /> dewatering or air sparging. <br /> 1/3-5/95 Five borings were drilled during this time. P1 was completed as VE1 and air <br /> sparge observation well ASO3. P2 was completed as ASO1. P3 was completed <br /> as VE 3 and ASO2. P4 was completed as VE2. Air sparge well AS1 was <br /> installed. <br /> 01/14/95 A vapor extraction and air sparge test was conducted on this date. <br /> 03/95 The date of the Final Remedial Plan (FRP) that details the January 1995 work <br /> and proposes vapor extraction and air sparging for remediation. <br /> 08/18/95 The date of the EHD letter approving the FRP. <br /> 03/07/96 Vapor extraction wells VE5 and VE6 and monitoring well MW5 were installed on <br /> this date. <br /> 06/21/96 The date of the report on the March 1996 work. <br /> 08/96 Start up of the vapor extraction system was attempted during this time, but <br /> continuous operation wasn't successful. <br /> 04/01/97 The date operation of the vapor extraction system began. <br /> 04/19/97 The date vapor extraction well VW7 and air sparge wells IAS2 through IAS7 were <br /> installed. <br /> 04/24/97 The date monitoring well MW6 was installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.