My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:28:03 PM
Creation date
4/15/2020 2:17:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapin Brothers Page 4 <br /> 1766 Monte Diablo May 21, 2009 <br /> Stockton, CA <br /> 05/01/97 The date operation of the air sparge system began. <br /> 04/01/98 The date monitoring well MW 7 was installed. <br /> 04/22/98 The date of Quarterly Report— March 1998 that discusses installation of MW7. <br /> 06/22/98 The EHD staff observed installation of IAS8, IAS9 and IAS10 on this date. The <br /> consultants report dated August 17, 1998, Quarterly Report — June 1998 states <br /> that on 7/29/97 three IAS points were installed, IAS7 through IAS9, but the EHD <br /> is not aware of well installations on that date. The designation of the wells is <br /> incorrect because IAS7 was installed on 4/19/97. The map in the report shows <br /> two wells designated as IAS7 and an IAS8. <br /> 05/24-25/99 Five soil probes CB1 through CB5 and hydro punch borings CHP1 through CHP7 <br /> were performed on these dates. <br /> 07/20/99 Hydro punch borings CHP8, CHP9 and CMPSC were performed this date. <br /> 09/08/99 The date of the quarterly report that discusses the May and June 1999 work and <br /> states the vapor extraction and air sparge systems are no longer in operation. <br /> 04/05/00 A meeting was held at the EHD office with Russell Chapin and his consultant on <br /> this date and it was agreed that ground water extraction should be conducted <br /> since vapor extraction and air sparging were no longer effective. <br /> 03/07/01 An aquifer pump test was performed and temporary wells T1 through T3 were <br /> installed on this date. <br /> 06/07/01 The date of Ground Water Aquifer Pumping Test Report— First Quarter 2001 that <br /> discusses the March 2001 work. <br /> 06/15/01 The date of the EHD letter of approval of the Remedial Action Work Plan <br /> Revision dated 6/28/01 in which it states the groundwater pump and treat <br /> remediation will be conducted to reduce contaminants to remedial goals of <br /> maximum contaminant levels. <br /> 08/10/01 The date of Advanced GeoEnvironmental Inc. (consultant for Chapin Brothers) <br /> letter stating that removal of 80% of mass should be the cleanup goal which was <br /> never approved by the EHD. <br /> 12/21/01 Three ground water extraction wells EW1 through EW3 were installed this date. <br /> 04/02/02 The groundwater extraction system operation began on this date. <br /> 08/12/02 The date of Quarterly Report — Second Quarter 2002 that discusses installation <br /> of the wells in December 2001 and installation and start up of the ground water <br /> extraction system in January through April 2002. <br />
The URL can be used to link to this page
Your browser does not support the video tag.