My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2403
>
3500 - Local Oversight Program
>
PR0545603
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 4:31:01 PM
Creation date
4/15/2020 4:23:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545603
PE
3528
FACILITY_ID
FA0006095
FACILITY_NAME
PETERSON MFG
STREET_NUMBER
2403
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
2403 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DELTA PUMPS YOUR Water Service Center <br /> Pump Manufacturing& Rebuilding <br /> Water Well Developers <br /> Electric Motor Specialists <br /> Delta Pumps dba Stockton Armature&Motor Works <br /> 646 S. California Street,P.O. Box 1927 <br /> Stockton,California 95201 gmayXg <br /> 209-466-9625 January 13 , 1992 <br /> JAN 13 1993 <br /> Environmental Health Services ENVIRONMENTALHEALTH <br /> 445 N. San Joaquin St. PERMIT/SERVICES <br /> Stockton, CA 95205 <br /> Re: Well Destruction proceedure at 2403 Navv Drive <br /> Dear Ms Meays; <br /> We propose the following proceedure in destroying the 8" well at <br /> the above address. <br /> 1 . Set up cable tool drilling rig over well. <br /> 2 . Install perforating tools and pipe to 100 feet. <br /> 3 . Proceed to rip four holes around the circumference. <br /> 4 . Repeat the proceedure each 2 foot intervals upward to <br /> 35 ft. elevation. <br /> 5. Bail the well. <br /> 6 . Install treming pipe into 150 ft. well. <br /> 7 . Pressure grout the well with cement and benonite slurry from <br /> 150 ft. to within 2 ft. below ground level. Remove treming <br /> pipe as well filling progresses. <br /> 8 . Simultanously as cement is being pumped, waste water will be <br /> pumped into awaiting tanks for characterization and disposal. <br /> 9 . The concrete base around the well has been removed. The ground <br /> around the well will be excavated to 3 ft. below surface and <br /> the steel casing will be cut 2 ft. below surface. A concrete <br /> mushroom will be poured over the casing and around the casing. <br /> After final inspection by Environmental Health Services the <br /> remaining hole will be filled with dirt. <br /> We are prepared to proceed t week January 18 , 1993. <br /> Res iv <br /> Robert M. Crow <br />
The URL can be used to link to this page
Your browser does not support the video tag.