Laserfiche WebLink
DELTA Q- i �J m P S YOUR Water Service Center <br /> Pump Manufacturing&Rebuilding <br /> Water Well Developers <br /> Electric Motor Specialists <br /> Delta Pumps dba Stockton Armature& Motor Works <br /> 646 S.California Street,P.O. Box 1927 <br /> Stockton,California 95201 <br /> 209-466-9625 RpsayXI <br /> December 24 , 1992 <br /> DEC 2 9 1992 <br /> Environmental Health Services HEALTH <br /> NT4L <br /> NVIIZONMEH <br /> 445 N. San Joaquin St . ENVIRONMENTAL <br /> Stockton , CA 95205 <br /> Re: Well destruction proceedure at 2403 Navy Drive <br /> Dear Me Meays ; <br /> We propose the following proceedure in destroying the 8" well at the <br /> above address: <br /> 1 . Set up cable tool drilling rig over well. <br /> 2 . Install perforating tools and pipe to 100 ft . <br /> 3 . Proceed to rip four holes around the circumference . <br /> 4 . Repeat the proceedure each 2 foot intervals upward to 35 ft. <br /> elevation . <br /> 5 Bail the well. .. <br /> 6. Install 3 treming pipe into 150 ft . well . <br /> 7 . Pump Mitchler ' s mix #2999 cement slurry from 150 ft . to within <br /> 2ft . I-elo�n ground level . Remove 3" treming pipe as well <br /> filling progresses . <br /> 8 . Simultanously as cement is being pumped , waste water will he <br /> pumped into ai-,aiting tanks for characterization and dispceal . <br /> 9 . The concrete base around the well has been removed . The ground <br /> around the well. will be excavated to 3 ft . below surface and <br /> the steel casing will be cut 2 ft . below surface . A concrete <br /> mushroom will 1,e poured over the 8" casing and around the <br /> casing . After final inspection by Environmental Health Services <br /> the remaining hole will be filled with dirt. <br /> We are prepared to proceed the week of January 11 , 1993 . <br /> :Respe ctiv <br /> Robert M. Crowe <br />