My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
1600 - Food Program
>
PR0544225
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:07:35 AM
Creation date
4/16/2020 11:15:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0544225
PE
1616
FACILITY_ID
FA0025137
FACILITY_NAME
CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
P_LOCATION
04
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i6�8'I'B�,YI�d H9°mP98S8�9vIB$;68958::"g:z'e�'$i�:8m::..:e:.......- <br /> HYDROSTATIC SUMP MONITOR A I <br /> WITH SENSOR evaial`�alr 'i ? i- <br /> VAPOR RECOVERY 2" UNION <br /> CB:`Y"d-�n:33;:: <br /> e�°"B'.r'e:...>,. <br /> FILL SPILL CONTAINMENT ADAPTER AND CAP _ F- <br /> 3. <br /> = <br /> JUNCTION BOX — II:II; sw ae's:lli °i ? <br /> MANHOLE (5 GAL.) ` ..� =i I_°;g i,.g;:RPNH�,�.... :i <br /> 2" ELBOW 4NIPPLE <br /> " CONCRETE MUST R �-�_ _ ;=1 <br /> NOT SHOWN TO SCALE SPILL CONTAINMENT MANHOLE AT 2 BALL VALVE ='=v=".._ .. ~~° <br /> EXTEND BELOW TOP OF I i � '' _ s?I .. .` ` I <br /> JUNCTION BOX TRUCK VAPOR RETURN 5 GAL. ._ R "=��v.g?:=:_. :=::;:..::,.: <br /> PRESSURIZED LINE MONITORED SPACE. ' Ii=�� = 9. � <br /> 2 a a,e mm..a.:..:,. ;m.g.:.:.: <br /> TANK LEVEL MONITOR WITH i=aa§Ie:::em: m.eesm esti : =i�;'.=e=`,` ': :::: <br /> 4"FILL CAP&ADAPTER LEAK DETECTOR ;; ` <br /> MONITORING CAP AND ADAPTER <br /> 21 <br /> 11252 <br /> e <br /> ofrc h ite11ctu re <br /> <a i n e e rSPILL.COLLECTOR (FILL) <br /> L-FIB Sc �ssociaFc_s� Ltd. <br /> CONCRETE MUST •e." d ° ' CONDUIT 867 Pacific Street,Suite 120 <br /> a4. EXTEND BELOW 4 N oo e 4 4- San Luis Obispo, CA 93401 <br /> TOP OF a ph 845.540.5240 <br /> e-d •.6 a,., en � e-.d de e <br /> 4 MONITORED PEA GRAVEL •° a d fax 805.540.5241 <br /> SPACE. BACKFILL •° www.LH Bassoc.com <br /> a FUEL TURBINE <br /> SEAL-OFF (TYP.) <br /> 2"CLOSE NIPPLE <br /> VACUUM SUPPLY FROM TURBINI <br /> a 48"DOUBLED WALLED Q�L01 ESSIO^, <br /> e d HYDROSTATIC MONITOR — SUMP HYDROSTATIC NON-DISCRIMINATING <br /> 4"SCHEDULE 40 RISER FIBERGLASS SUMP RISER WITH LID MONITORING CONNECTION SUMP SENSOR <br /> 2" ELBOW 314"STEEL CONDUIT PER <br /> SPILL COLLECTOR (VAPOR) O <br /> DOUBLED WALLED SUMP 2"x24"FLEXIBLE CONNECTOR TURBINE TO ELEC. PANEL us No.78916 <br /> NOTE: IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL SUMP ex 03118 <br /> PENETRATION BOOT 4"SCHEDULE 40 RISER MALExFEMALE (TURBINE POWER) SENSORS AS SHOWN. * p <br /> VEEDER-ROOT VACUUM <br /> PIPE CAP WITH DOUBLE WALLED SUMP MOMTgRING SYSTEM SENSORS ATF <br /> HOLE FOR CONTROL PENETRATION BOOT ,I 0t CAS SFO <br /> WIRES DOUBLED WALLED SUMP I I DOUBLE WALLED SUMP <br /> PENETRATION BOOT PENETRATION BOOT <br /> 1"CONDUIT LOOPED TO J-BOX 1"CONDUIT LOOPED TO J-BOX @ i i 6"R. <br /> @ NEXT SUMPP NEXT SUMP MAX. BEND 1"CONDUIT TO TLM CONSOLE <br /> 13 CONSULTANTS <br /> IN STORE (LEAK MONITORING, <br /> DOUBLE WALL SUMMP <br /> SUMP SENSOR&TLM) <br /> o EXTRACTOR FITTING <br /> DOUBLE WALL SUMP I I i <br /> 3"OVER 2"D.W. <br /> COLLAR BY TANK MFR 4"SCH.40 RISER — — FRP PRODUCT PIPING <br /> II <br /> EXTRACTOR FITTING 2"FRP TERMINATION FITTING <br /> II WITH TEST PORT TURNED UP SUMP SENSOR INSTALLATION <br /> SUMP SENSOR AND MONITORED AND VACUUM <br /> TUBING ROUTED TO VAC <br /> I SENSOR ASSEMBLY SCALE: � 112"=1'-0" <br /> DOUBLE WALLED TANK COLLAR `0 (SHOWN VERTICAL FOR <br /> GRAPHICAL REPRESENTATION I <br /> CLARITY-TYP.) <br /> SUMP LIQUID SENSOR SEE MANUFACTURES 3"OVER 2" D.W. <br /> LITERATURE FOR DETAILS FRP VENT PIPING 18"DIAMETER MANHOLE <br /> TANK LEVEL MONITOR PROBE <br /> INTERSTITIAL DRAIN PLUG ° NOV FIBERGLASS D.W. CUFF <br /> SET OVERFILL ALARM AT 90/o ENTRY e a a <br /> TANK CAPACITY a e a <br /> OVERFILL VALVE SET AT 90% NOTES: BELLxFEMALE FRP a a <br /> 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT 3"VAPOR RECOVERY BEYOND AT GASOLINE ADAPTER (TYP,) <br /> SUMPS PREFERRED. 15"MAXIMUM ALLOWABLE TANK ONLY STEEL RISER 1"MONITORING CONDUIT LOOP TO FILL <br /> 4"FILL TUBE PENETRATOIN ANGLE. SUMP REVISIONS <br /> VACUUM TUBES AT ALL PRODUCT,VENT — INTERSTITIAL DRAIN PLUG <br /> 2. USE SUMP PENETRATION BOOTS AT ALL AND VAPOR PIPING IN SUMP SEAL-OFF PLAN CHECK 201684 <br /> 07 DECEMBER 2016 <br /> PENETRATIONS OF SUMP. NOTES: 1"CONDUIT HOMERUN TO <br /> 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN <br /> 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT SUMPS PREFERRED.20° MAXIMUM ALLOWABLE PENETRATION ANGLE. BUILDING <br /> V-0"OF THE TOP OF SUMP. 2. USE DOUBLE WALLED SUMP PENETRATION BOOTS AT ALL PENETRATIONS OF SUMP. <br /> 4"SGH 40 PVC OR FRP RISER TO <br /> GRADE <br /> 3.ALL JUNCTION BOXES ARE TO BE PLACED WITHING T-0"OF THE TOP OF SUMP. <br /> (2)1"AND(2)4"GND <br /> FILL MAN WAY 4 T U RBI N E, VE N T AN D VAPO R SUMP 1"MONITORING CONDUIT LOOP TO CLAMPS WITH*6 BARE SUBMITTAL DATES <br /> TURBINE SUMP SOLID <br /> (GASOLINE} SCALE NT5 (GASOLINE} SCALE NTS <br /> OWNER: <br /> 03/29/2016 <br /> SINGLE POINT HYDROSTATIC REG. AGENCIES <br /> MONITORING SENSOR <br /> O.T.B.: <br /> BRINE HYDROSTATIC RESERVOIR <br /> NI IN01 <br /> PROJECT NO. <br /> FILL SPILL CONTAINMENT 2"UNION — r _/� �� _ 15-13-001 <br /> MANHOLE 5 <br /> DRAWN BY: <br /> NOT SHOWN TO SCALE JUNCTION BOX r — <br /> JUNCTION BOX HYDROSTATIC SUMP MONITOR 2" ELBOW 42" MANHOLE CONCRETE MUST AFS <br /> WITH SENSOR 2"BALL VALVE EXTEND BELOW TOP OF CHECKED BY: <br /> 4"FILL CAP&ADAPTER PRESSURIZED LINE 2 NIPPLE MONITORED SPACE. JRB <br /> 4"FELL SEAL ADAPTER AND 4" TANK LEVEL MONITOR WITH <br /> FILL LOCKING CAP MONITORING CAP AND ADAPTER LEAK DETECTOR <br /> SPILL COLLECTOR (FILL) _� • , <br /> �ae - n ° e HYDROSTATIC MONITOR DETAIL <br /> d d <br /> CONCRETE MUST <br /> ea EXTEND BELOW < , <br /> • . ° TOP OF ° <br /> e d o n p a <br /> iQ. d <br /> MONITORED N ro a <br /> SPACE. PEA GRAVEL d <br /> a BACKFILL FUEL TURBINE co <br /> ea W <br /> Lo <br /> SEAL-OFF (TYP.) <br /> W <br /> 2"CLOSE NIPPLE ----- <br /> a . VACUUM SUPPLY FROM TURBINI Z <br /> 4"SCHEDULE 40 RISER 48"DOUBLED WALLED t 1 <br /> HYDROSTATIC MONITOR SUMP HYDROSTATIC <br /> FIBERGLASS SUMP RISER WITH LID MONITORING CONNECTION W <br /> DOUBLED WALLED SUMP 2, ELBOW 314"STEEL CONDUIT PER <br /> PENETRATION BOOT 4"SCHEDULE 40 RISER TURBINE TO ELEC. PANEL <br /> 2"x24"FLEXIBLE CONNECTOR = Q <br /> PIPE CAP WITH MALExFEMALE (TURBINE POWER) Z j U <br /> HOLE FOR CONTROL VEEDER-ROOT VACUUM LOCKABLE CAP <br /> WIRES DOUBLED WALLED SUMP DOUBLE WALLED SUMP —— _ ,.._,____ „_ MONITORING SYSTEM SENSORS 12" O MANHOLE DIN Cn U <br /> PENETRATION BOOT PENETRATION BOOT DOUBLE WALLED SUMPCD LLJ <br /> 1"CONDUIT LOOPED TO J-BOX - PENETRATION BOOT 24 Z <br /> @ NEXT SUMPP 1"CONDUIT LOOPED TO J-BOX @ 6"R. 40 <br /> ALL AROUND �- Q <br /> NEXT SUMP i', MAX. BEND <br /> 1"CONDUIT TO TLM CONSOLE <br /> DOUBLE WALL SUMMP ---EXTRACTOR FITTING IN STORE (LEAK MONITORING, <br /> DOUBLE WALL SUMP I SUMP SENSOR&TLM) r <br /> COLLAR BY TANK MFR 0 3"OVER 2" D.W. <br /> 4"SCH.40 RISER FRP PRODUCT PIPING <br /> EXTRACTOR FITTING 2" FRP TERMINATION FITTING <br /> WITH TEST PORT TURNED UP <br /> O SUMP SENSOR AND MONITORED AND VACUUM <br /> TUBING ROUTED TO VAC SHEET TITLE <br /> SENSOR ASSEMBLY PEA GRAVEL a <br /> DOUBLE WALLED TANK COLLAR C° (SHOWN VERTICAL FOR 4" MONITORING PIPE m <br /> SUMP LIQUID SENSOR GRAPHICAL REPRESENTATION <br /> I CLARITY- P. 4" SCH. 40 FACTORY o <br /> SEE MANUFACTURES r <br /> LITERATURE FOR DETAILS - 3"OVER 2"D.W. SLOTTED P.V.C. WELL PIPING AND <br /> — FRP VENT PIPING SCREENS (MAXIMUM N <br /> INTERSTITIAL DRAIN PLUG MONITORING <br /> TANK LEVEL MONITOR PROBE NOV FIBERGLASS D.W. GUFF 0.05" - 0.02" <br /> SET OVERFILL ALARM AT 90% `— ENTRY HORIZONTAL SLOTS) INSTALL <br /> OVERFILL VALVE SET AT 90% NOTES: TANK CAPACITY TANK TRENCH <br /> 1-112"x2" <br /> BELLxFEMALE FRP SCH. 40 PVC CA BOTTOM DETAILS AT <br /> 1. PERPENDICULAR PENETRATIONS CONTAINMENT <br /> SUMPS PREFERRED. 15"MAXIMUM ALLOWABLE ADAPTER (TYP.) 2 TANKS <br /> 4"FILL TUBE PENETRATOIN ANGLE. 0. <br /> STEEL RISER <br /> U <br /> O <br /> 2. USE SUMP PENETRATION BOOTS AT ALL VACUUM TUBES AT ALL PRODUCT,AND INTERSTITIAL.DRAIN PLUG <br /> PENETRATIONS OF SUMP. VENT PIPING IN SUMP c� <br /> M <br /> 3. ALL JUNCTION BOXES ARE TO BE PLACED WITHIN NOTES: ° <br /> 'a <br /> V-0"OF THE TOP OF SUMP. 1. PERPENDICULAR PENETRATIONS OF CONTAINMENT SUMPS PREFERRED.20° MAXIMUM ALLOWABLE PENETRATION ANGLE. <br /> v SHEET NO. <br /> 2. USE DOUBLE WALLED SUMP PENETRATION BOOTS AT ALL PENETRATIONS OF SUMP. cc <br /> ALL JUNCTION BOXES ARE TO BE PLACED WITHING T-0"OF THE TOP OF SUMP. <br /> FS-5 <br /> FILL MANWAYTURBINE AND VENT SUMP OBSERVATION WELL <br /> 7 DIESEL scALI N T s D I ES E I SCALE: N T S IF REQUIRED BY LOCAL JURISDICTION SCALL :N T S <br />
The URL can be used to link to this page
Your browser does not support the video tag.