Laserfiche WebLink
0 <br />v <br />e <br />PLUM13ING LEGEND <br />SYMBOL <br />DFSIGNATION <br />ABBREVIATION <br />DESCRIPTION <br />EXISTING <br />NEW <br />--� <br />�--- ---� <br />ACD <br />AIR CONDITIONING CONDENSATE DRAIN <br />KS -2 <br />SEE ARCH. E <br />SHE <br />CW <br />COLD WATER <br />�-----21-----------2 <br />MOP SINK <br />DHW <br />DOMESTIC HOT WATER (110"F) <br />--- - <br />---------2 <br />DHW (140) <br />DOMESTIC HOT WATER (140°F) <br />-c <br />_ <br />G <br />NATURAL OR LIQUIFIED PETROLIUM GAS <br />PRIMER. <br />FLOOR SINK <br />S <br />SANITARY <br />FLOOR SINK <br />FS -2 <br />ZURN <br />ZURN <br />SEE ARCH. <br />S <br />SANITARY BELOW FLOOR/GRADE <br />r- sv sv <br />sv -- sv <br />ST <br />STORM DRAIN <br />- v v -- <br />v v <br />V <br />VENT LINE <br />ADA, SIPHON JET <br />SYMBOL <br />ABBREVIATION <br />DESCRIPTION <br />�- - owl <br />POC <br />POINT OF CONNECT TO EXISTING <br />1. F&I IN MOUNTING BOX. PLACE BOX ABOVE CEILING. <br />0-0 <br />UP / DOWN <br />PIPE UP / DOWN <br />❑o <br />FS <br />FLOOR SINK <br />Uo LJ <br />FD <br />FLOOR DRAIN <br />3.00 <br />UTILITY. <br />2.25 <br />FIXTURE TRAP W/ VENT CONN. <br />2 <br />O <br />HB / WHT <br />HOSE BIBB / WALL HYDRANT <br />4.00 <br />SOV / BV /GV <br />SHUT --OFF, BALL OR GATE VALVE <br />r/ i <br />L J <br />SOV <br />SHUT-OFF VALVE IN VALVE BOX <br />2.50 <br />WM <br />WATER METER IN 80X <br />JIL O <br />VTR <br />VENT THRU ROOF <br />o XX <br />CO / FCO / GCO <br />CLFANOUT / FLOOR / GRADE <br />XXOO XX <br />CO / FCO / GOO <br />2 ----WAY CLEANOUT / FLOOR / GRADE <br />-NWCO <br />WCO <br />WALL CLEANOUT <br />3.0 <br />225 <br />PIPE TRANSITION <br />3.00 <br />2.25 <br />FLOW DIRECTION <br />GB ER AD NOTES: <br />1. ALL PLUMBING FIXTURES SHALL BE LABELED AS MFFTING EPA WATER SENSE (WWW. EPA. GOV/WATFRSENSE). <br />2. EXACT LOCATION OF PLUMBING FIXTURES SHALL BE DETERMINED FROM ARCHITECTURAL DRAWINGS. <br />3. BEFORE SUBMITTING BID, THE PLUMBING CONTRACTOR SHALL REVIEW THE ARCHITECTURAL DRAWINGS AND <br />INCLUDE IN HIS BID AN AMOUNT TO FURNISH AND INSTALL ANY FIXTURES WHICH ARE SHOWN IN ADDITION <br />TO FIXTURES SHOWN ON THE PLUMBING DRAWINGS. <br />4. CONTRACTOR SHALL VERIFY AND COORDINATE LOCATION OF ALL PLUMBINC LINES WITH DUCTWORK AND <br />ELECTRICAL SERVICES. <br />5. THE INSTALLATION OF ALL VALVES, UNIONS, THERMOMETERS, GAUGES, OR OTHER INDICATING OR RECORDING <br />EQUIPMENT, OR SPECIALTIES REQUIRING FREQUENT READING, REPAIRS, ADJUSTMENT, INSPECTION, REMOVAL <br />OR REPLACEMENT SHALL BE CONVENIENTLY AND ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED <br />BUILDING. <br />6. WHERE POSSIBLE, COMBINF PLUMBING VENTS TOGETHER SO AS TO MAKE THE MINIMUM NUMBER OF ROOF <br />PENETRATIONS. <br />7. WATER CLOSETS IN PUBLIC TOILET ROOMS SHALL CENTER ON THE FINAL LAYOUT OF TOILET PARTITIONS AND <br />BE INSTALLED AS INDICATEDE IN THE ARCHITECTURAL DRAWINGS. <br />8. ALL FLUE VENTS AND VTRS THROUGH ROOF SHALL BE A MINIMUM OF 10' FROM ALL AIR INTAKES AND LVAP. <br />COOLERS. <br />9. CONTRACTOR SHALL NOT CUT HOLES IN STRUCTURAL MEMBERS WITHOUT FIRST SECURING WRITTEN <br />APPROVAL FROM ARCHITECT. <br />10, CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT CONNECTION OF DISSIMILAR METALS. <br />11. CONTRACTOR SHALL ROUGH -IN ALL WASTE AND SUPPLIES TO SPECIAL EQUIP. ACCORDING TO <br />MANUFACTURERS SHOP DRAWINGS AND MAKE FINAL CONNECTIONS, ALL SUPPLIES SHALL BE VALVED. <br />12. COPPER POTABLE WATER PIPING VELOCITY: FOR PIPE SIZES < 2y2" PIPE VELOCITY SHALL NOT TO EXCEED 5 <br />FP S. <br />13. CONTRACTOR SHALL VERIFY INVERT ELEVATION OF SEWERS TO WHICH NEW WASTE LINES ARE TO BE <br />CONNECTED PRIOR TO MAKING UP OR INSTALLING ANY OF THE NEW SANITARY SYSTEM. <br />14. FLASHED AND COUNTERFLASH ALL VTRS, PIPES AND FLUES THRU ROOF. MAKE PENETRATIONS WATER TIGI--1 r. <br />15. NO PLUMBING PIPING SHALL BE INSTALLED IN COMMON DEMISING WALLS. <br />16. SANITARY LINES SHALL HAVE A MINIMUM SLOPE OF 2% PER CPC SEC 708.0 <br />E ED VERIFICATION N DED <br />i <br />NATURAL GAS DOMESTIC HOT WATER HEATER SCHEDULE <br />GAS (MBH) STOR RECOV EFF WATER TEMP (°F) CONNECTION SIZES (IN) ELEC. OPER. r/1� <br />MARK MAKE MODEL N0. TANK RATE a COMB (V1PH1 HZ) WEIGHT REMARKS <br />INPUT OUTPUT (GAL.) (GPH) (70) EWT LWT STOR CW HW GAS FLUE AIR (LBS) <br />___ ___ a 3!4 314 4 4 120/1/60 73 NOTES 1, 2 &3 <br />MIH -1 RINNAI RUR981(KBP3237FFUD 199 195 98 /0 40 140 --- 314 = <br />NOTES. <br />1 F&I WITH FORCED AIR COMBUSTION UNIT, 12 V DC TEMPERATURE CONTROLLER, BUILT-IN RECIRCULATION PUMP, MC-91-2US CONTROLLER, 3 WATTANTI-FROST <br />PROTECTION, RINNAI THERMAL BYPASS VALVE & IPEX CONCENTRIC 4" VENT KIT. UNIT ACTIVATION FLOW RATE 0.4 GPM. <br />2 BASED UPON AN ENERGY FACTOR FOR NATURAL GAS = 0.95 <br />3 USE FEMALE UNTHREADED, SOCKETED ENDS, LONG TURN (SWEEP) ELBOWS FOR ALL CHANGES IN FLUE PIPE & COMBUSTION AIR PIPE DIRECTION CHANGES. <br />1. THE PLUMBING CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID TO FIELD VERIFY ALL EXISTING CONDITIONS WHICH IV AY AFFECT <br />HIS BID. THE FOLLOWING ITEMS SHALL_ BE VERIFIED. <br />1.A. PLACEMENT SIZE CAPACITY MANUFACTURER AND CONDITION OF ALL EXISTING PLUMBING EQUIPMENT WITHIN SCOPE OF <br />WORK, WHETHER SPECIFICALLY SHOWN OR NOT. <br />1.B. SIZE AND LOCATION OF ALL EXISTING WASTE, GREASE WASTE, VENT AND WATER PIPING. <br />2. ALL REFERENCES IN THESE DRAWINGS TO EXISTING EQUIPMENT, FIXTURES AND PIPING TO BE VERIFIED BY THE CONTRACTOR <br />PRIOR TO SUBMITTING THE BID. THE BID SHALL INCLUDE ANY AND ALL AMOUNTS REQUIRED TO ACCOMMODATE EXISTING <br />CONDITIONS, <br />3. NO ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY EXISTING CONDITIONS. <br />4. ANY DISCREPANCIES WHICH MAY AFFECT THE CONTRACTOR BID SHALL BE BROUGHT TO THE ATTENTION OF THE: ENGINEER AND <br />ARCHITECT FOR DIRECTION. <br />5. PLUMBING ROUTINGS BASED ON OWNER'S SCHEMATICS OF LOCATION OF EXISTING FIXTURES AND SHELL DRAWINGS. CONTRACTOR <br />RESPONSIBLE FOR VERIFICATION OF ACTUAL LOCATION OF SUPPLY LINES AND MAKING APPROPRIATE ADJUSTMENTS TO ACTUAL <br />CONDITIONS IN THE FIELD. <br />6. CONTRACTOR SHALL VERIFY INVERT ELEVATION OF SEWERS TO WHICH NEW SANITARY LINES ARE TO BE CONNEC I"' C) BEFORI <br />SUBMITTING THE BID, <br />7. PRIOR TO CONSTRUCTION VERIFY THE LOCATION OF THE HVAC/WALK-IN CONDENSATE FLOOR SINK. IF SLOPE AND D6TANCIE OR <br />IF IT IS INFFASIBLE TO DISPOSE OF WALK-IN COOLER CONDENSATE. USE: A CONDENSATE PUMP. <br />PLUMBING FIXTURES SCHEDULE <br />vODEL NUMBER FITTING AND CAPACITY ACCESSORIES/REMARKS <br />FIXTURE <br />DFSIGNATION <br />MFR. AND <br />THERMOSTATIC MIXING VALVE <br />TMV-1 <br />SYMMONS 7-: <br />KITCHEN SINK (3 COMP.) <br />KS -1 <br />SEE ARCH. E <br />SHE <br />KITCHEN SINK (1 COMP.) <br />KS -2 <br />SEE ARCH. E <br />SHE <br />RISER TAILPIECE AND P -TRAP. <br />ET A1.0 <br />SEE ARCH. E <br />MOP SINK <br />MS -1 <br />SHE <br />WATER CLOSET <br />WC -1 <br />ZURN Z5555 -k <br />LAVATORY <br />LV -1 <br />_ <br />DU <br />SHEET A1.0 <br />PRIMER. <br />FLOOR SINK <br />FS-1,FS-3 <br />ZUF <br />FLOOR SINK <br />FS -2 <br />ZURN <br />ZURN <br />SEE ARCH. <br />FLOOR DRAIN <br />FD -1 <br />SHEET A1.0 <br />MPG <br />HAND SINK <br />HS -X <br />SH <br />GREASE INTERCEPTOR <br />GT -1 <br />SCHI <br />ADA, SIPHON JET <br />FLUSH <br />JAY R. SMITH <br />TRAP PRIMER <br />TP -1 <br />TRAP <br />OTES: <br />1. F&I IN MOUNTING BOX. PLACE BOX ABOVE CEILING. <br />ILLUMINATE UPON SWITCH SENSING WATER. <br />2. SHUT-OFF VALVES ON UPSTREAM SIDE OF CW & Hti <br />3. Z8800 STOPS W/FLEXIBLE SUPPLIES; 28700 P -TR, <br />Z8946 -3 -NT ADA TRAP, STOP & SUPPLY PROTECT <br />5. POLISHED BRASS 5' SQUARE TOP, IRON BODY WITH <br />6. JAY R. SMITH 2699 AUTOMATIC TRAP PRIMER. <br />7. WITH ACID RESISTANT BODY; NICKEL BRONZE DOME <br />AND NUMBER OF PIPES DISCHARGING TO UNIT. <br />1. THE PLUMBING CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID TO FIELD VERIFY ALL EXISTING CONDITIONS WHICH IV AY AFFECT <br />HIS BID. THE FOLLOWING ITEMS SHALL_ BE VERIFIED. <br />1.A. PLACEMENT SIZE CAPACITY MANUFACTURER AND CONDITION OF ALL EXISTING PLUMBING EQUIPMENT WITHIN SCOPE OF <br />WORK, WHETHER SPECIFICALLY SHOWN OR NOT. <br />1.B. SIZE AND LOCATION OF ALL EXISTING WASTE, GREASE WASTE, VENT AND WATER PIPING. <br />2. ALL REFERENCES IN THESE DRAWINGS TO EXISTING EQUIPMENT, FIXTURES AND PIPING TO BE VERIFIED BY THE CONTRACTOR <br />PRIOR TO SUBMITTING THE BID. THE BID SHALL INCLUDE ANY AND ALL AMOUNTS REQUIRED TO ACCOMMODATE EXISTING <br />CONDITIONS, <br />3. NO ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY EXISTING CONDITIONS. <br />4. ANY DISCREPANCIES WHICH MAY AFFECT THE CONTRACTOR BID SHALL BE BROUGHT TO THE ATTENTION OF THE: ENGINEER AND <br />ARCHITECT FOR DIRECTION. <br />5. PLUMBING ROUTINGS BASED ON OWNER'S SCHEMATICS OF LOCATION OF EXISTING FIXTURES AND SHELL DRAWINGS. CONTRACTOR <br />RESPONSIBLE FOR VERIFICATION OF ACTUAL LOCATION OF SUPPLY LINES AND MAKING APPROPRIATE ADJUSTMENTS TO ACTUAL <br />CONDITIONS IN THE FIELD. <br />6. CONTRACTOR SHALL VERIFY INVERT ELEVATION OF SEWERS TO WHICH NEW SANITARY LINES ARE TO BE CONNEC I"' C) BEFORI <br />SUBMITTING THE BID, <br />7. PRIOR TO CONSTRUCTION VERIFY THE LOCATION OF THE HVAC/WALK-IN CONDENSATE FLOOR SINK. IF SLOPE AND D6TANCIE OR <br />IF IT IS INFFASIBLE TO DISPOSE OF WALK-IN COOLER CONDENSATE. USE: A CONDENSATE PUMP. <br />PLUMBING FIXTURES SCHEDULE <br />vODEL NUMBER FITTING AND CAPACITY ACCESSORIES/REMARKS <br />N Z1751 1 FOR FINISHFD FLOOR AREA I 12" SQ TOP X 8" DEEP. SEE NOTE 7 <br />FD -1749 <br />FD <br />SET OUTLET TEMPERATURE FOR <br />12" SQ TOP X 4" DEEP. SFE <br />NOTE 1 <br />100-102 B SERIES <br />FOR FINISHED FLOOR AREA <br />110 F. <br />NOTE 5 <br />CONDENSATE DRAIN <br />QUIP. SCHED. ON <br />SEE <br />ARCH. EQUIP. SCHED. ON <br />ANGLE STOPS, <br />RISER TAILPIECE AND P -TRAP. <br />ET A1.0 <br />EET A1.0 <br />SHEFT A1.0 <br />SEE NOTE 2 <br />SEE NOTE 2. <br />QUIZ='. SCHED. ON <br />SEE <br />ARCH. EQUIP. SCHED. ON <br />ANGLE STOPS, <br />RISER TAILPIECE AND P -TRAP. <br />ET A1.0 <br />DU <br />SHEET A1.0 <br />PRIMER. <br />SEE NOTE 2. <br />QUIP. SCHED. ON <br />SFE <br />ARCH. EQUIP. SCHED. ON <br />FINISHED FLOOR <br />NOTE 2 <br />FT A1.0 <br />GPM <br />SHEET A1.0 <br />MPG <br />MEDIUM PRESSURE GAS PIPING <br />PRV <br />PRESSURE RELIEF VALVE <br />RD <br />FLOOR MOUNTFD, <br />ELONGATED BOWL AND FRONT <br />ADA, SIPHON JET <br />FLUSH <br />TANK, 1.28GAL PER FLUSH <br />OPEN <br />SEAT. SEE NOTE 2. <br />BURN <br />ZURN <br />Z81104 -XL -3M FAUCET ON <br />ANGLE STOPS <br />W/ EXCUTCHEON & FLEXIBLE <br />:5340 <br />4" CENTERS <br />W/4" WRIST BLADES <br />RISERS. <br />SEE NOTES 2, 3, 4 & 6. <br />N Z1751 1 FOR FINISHFD FLOOR AREA I 12" SQ TOP X 8" DEEP. SEE NOTE 7 <br />FD -1749 <br />FD <br />FOR FINISHED FLOOR AREA <br />12" SQ TOP X 4" DEEP. SFE <br />NOTE 7 <br />-2321 -ST <br />FOR FINISHED FLOOR AREA <br />F&I WITH TRAP PRIMER. SEE <br />NOTE 5 <br />CONDENSATE DRAIN <br />AFF <br />CW & HW WATER HAMMER ARRESTERS; AIS <br />EQUIP. SCHED. ON <br />SEE ARCH. EQUIP, SCHED. ON <br />STOPS; RISER; TAILPIECE AND <br />P -TRAP <br />EET A1.0 <br />SHEET A1.0 <br />SEE NOTE 2 <br />CLEANOUT TO GRADE <br />ER GB -50 <br />50 GPM 249 LBS CAPACITY <br />INTEGRATED FLOW CONTROL <br />DEVICE <br />2699 AUTOMATIC <br />DOMESTIC HOT WATER RETURN <br />DU <br />DRAINAGE FIXTURE UNITS <br />PRIMER. <br />FURNISH AND INSTALL <br />FCO <br />FLOOR CLEANOUT <br />COLD I HOT IWASTE VENT <br />WATER I WATER SIZE <br />3/4 3/4 m- - - - <br />3/4 3/4" 2" 2» <br />3/4„ 3/4„ <br />3/4» 3/4» <br />y2" --- <br />Y2 2 <br />J/2 y2„ <br />2" 2» <br />3" 2" <br />3„ 2„ <br />2" 1y" <br />2 <br />1 y2„ 1 y2„ <br />3» 2„ <br />DRIP PAN TO BE PLACED BELOW MOUNTING BOX WITH MOISTURE SWITCH. PLACE LIGHT IN CEILING TILE NEAR BOX. LIGHT TO <br />V LINES ABOVE CEILING. <br />`,P & Z8746 -PC GRID STRAINFR. <br />QRS FOR OFFSET GRID STRAINER. <br />CLAMPING COLLAR, ADJUSTABLE NICKFL BRONZE STRAINER ASSEMBLY & TRAP PRIMER CONNECTION WITH PLUG. <br />STRAINER; CLAMPING COLLAR; AND NON -TILT LOOSE GRATE WITH 112" SQUARE OPENINGS. y2 OR 3/4 GRATE AS REQUIRED BY SIZE <br />ABBREVIATIONS <br />ABBREV. <br />DESCRIPTION <br />A/C <br />ABOVE CEILING <br />A/C <br />ABOVE GRADE <br />ACD <br />CONDENSATE DRAIN <br />AFF <br />ABOVE FINISHED FLOOR <br />B/F <br />BELOW FLOOR <br />B/G <br />BELOW GRADE <br />BP <br />BACKFLOW PREVENTER <br />COTG <br />CLEANOUT TO GRADE <br />CW <br />DOMFSTIC COLD WATER <br />DHW <br />DOMESTIC HOT WATER <br />DHWR <br />DOMESTIC HOT WATER RETURN <br />DU <br />DRAINAGE FIXTURE UNITS <br />F&I <br />FURNISH AND INSTALL <br />FCO <br />FLOOR CLEANOUT <br />FF <br />FINISHED FLOOR <br />GC <br />GAS COCK <br />GPM <br />GALLONS PER MINUTE <br />MPG <br />MEDIUM PRESSURE GAS PIPING <br />PRV <br />PRESSURE RELIEF VALVE <br />RD <br />ROOF DRAIN <br />RWL <br />RAIN WATER LEADER <br />SD <br />STORM DRAIN <br />UON <br />UNLESS OTHERWISE NOTED <br />VTR <br />VENT THRU ROOF <br />WOO <br />WALL CLEANOUT <br />WU <br />POTABLE WATER FIXTURE UNITS <br />OW PRESSURE NA I1-iRA L <br />FIXTURE <br />CAPACITY <br />GAS CADU LA_ ON <br />m <br />WIDTH <br />LENGTH <br />PIPE <br />DEMAND <br />APPLIANCES <br />LENGTH <br />(MBH) <br />4704 <br />EFFECTIVE VOLUME <br />(VOL*0.75/231) GALLONS <br />15'27 <br />WATER HEATER <br />199 <br />OVEN --------..-__.. -_ <br />540 <br />RTU -1 J._------ <br />82 <br />(E) RTU -2 <br />45 <br />TOTAL <br />24 <br />866 <br />IPE LENGTH FROM DEMISING WALL TO METER/PRV <br />68 <br />EFFECTIVE VOLUME <br />(VOL*0.75/231)/GALLONS <br />ASSEMBLY <br />2 MINUTE PERIOD FLOW <br />9.35 <br />PIPE FITTINGS EQUIV. LENGTH FROM BLDG TO METER,!I'RV <br />102 <br />LENGTH <br />ENGTH OF PIPE 1N TENANT SPACE <br />j 73 <br />17 <br />15 <br />7 <br />1785 <br />EFFECTIVE VOLUME <br />(VOL*0.85/231 }/GALLONS <br />EQJIV. LENGTH OF PIPE IN OR ON THE BUILDING <br />1''10 <br />3.28 <br />TOTAL EQUIVALENT SYSTEM PIPE LENGTH <br />212 <br />CW <br />MAIN <br />A <br />N OTES: <br />HW <br />1. PIPF SIZING BASED ON 2014 ASPS TABLE 7--5 PIPE SIZING FOR <br />PRESSURE <br />LESS THAN 2 PSI AND LOSS OF 0.3 INCH OF WATER COLUMN. <br />1 0.75 <br />2. CONTRACTOR SHALL VERIFY ACTUAL GAS PRESSURE AVAILABLE, <br />PIPE <br />LENGTHS, METER/PRV ASSEMBLY SIZE AND LOCATION PRIOR TO <br />0.75 <br />CONSTRUCTION. IF PRESSURE IS LESS THAN LISTED ED ABOVE, ACTUAL <br />PIPE <br />LENGTH IS MORE THAN LISTED ABOVE, CONTRACTOR SIIALL CONTACT <br />THE <br />ENGINEER FOR PIPE SIZING EVALUATION. COORDINATE WITH LOCAL <br />3.00 <br />UTILITY. <br />2.25 <br />GREASE TRAP SIZING <br />FIXTURE <br />CAPACITY <br />KITCHEN SINK <br />WIDTH <br />LENGTH <br />HEIGHT <br />VOLUME IN' <br />16 <br />21 <br />14 <br />4704 <br />EFFECTIVE VOLUME <br />(VOL*0.75/231) GALLONS <br />15'27 <br />3 -COMPARTMENT VOLUME <br />45.82 <br />2 MINUTE FLOW PFRIOD <br />22.91 <br />MOP SINK <br />WIDTH <br />LENGTH <br />HEIGHT <br />VOLUME IN 3 <br />24 <br />24 <br />10 <br />5760 <br />EFFECTIVE VOLUME <br />(VOL*0.75/231)/GALLONS <br />18.70 <br />2 MINUTE PERIOD FLOW <br />9.35 <br />HAND SINK <br />WIDTH <br />LENGTH <br />HEIGHT <br />VOLUME IN' <br />17 <br />15 <br />7 <br />1785 <br />EFFECTIVE VOLUME <br />(VOL*0.85/231 }/GALLONS <br />6.57 <br />2 MINUTE PERIOD FLOW <br />3.28 <br />TOTAL FLOW THRU GREASE TRAP <br />35.54 <br />ASSUMED AVA LAB LE WATER <br />PRESSURE CALCULATION <br />STATIC PRESSURE <br />75.0 PSI <br />PRESSURE DROP THRU METER <br />6.0 PSI <br />PRESSURE DROP @ BACKFLOW PREVENTER <br />10.0 PSI <br />AVAILABLE PRESS. ON HOUSE SIDE OF METER <br />59.0 <br />PSI <br />STIMATFD PIPE LENGTH - METER TO BLDG WALL <br />50 FT <br />EQUIV. LENGTH - METER TO BUILDING WALL <br />55 FT <br />P.D. - METER TO BUILDING WALL Q 6 PSIG/100 FT <br />3.3 PSI <br />PRESSURE AVAILABLE AT BUILDING WALL <br />55.7 PSI <br />PSI REQ- AT END OF THE LINE <br />20.0 PSI <br />PRESS. DROP @ THROUGH WATER HEATER <br />3.0 PSI <br />PRESS. DROP DUE TO PIPE ELEVATION CHANGES <br />4.3 PSI <br />REMAINING PRESSURE <br />28.4 PSI <br />SYSTEM LENGTH <br />125 <br />FT <br />EQUIVALENT PIPE LENGTH <br />206 <br />FT <br />ALLOWABLE LOSS/100FT OF PIPE: <br />REMAINING PRESS. X 10OFT <br />13.76 <br />PSI <br />EQ. LENGTH OF PIPE <br />FIXTURE UNITS DOMESTIC WATER <br />FIXTURES <br />AMNT.CW <br />INDIVIDUAL <br />FIXTURE UNITS <br />CUMMULATIVE FIXTURE <br />UNITS <br />TOT <br />CW <br />PER <br />FIXT <br />HW <br />PER <br />FIXT <br />CW <br />MAIN <br />A <br />CW <br />HW <br />LAVATORY (LV -1) <br />1 <br />1.0 <br />1 0.75 <br />0.75 <br />1.00 <br />0.75 <br />0.75 <br />MOP SINK (MS -1) <br />1 <br />3.0 <br />2.25 <br />2.25 <br />3.00 <br />2.25 <br />2.25 <br />HAND SINK (HS -1&2) <br />2 <br />2.0 <br />1.50 <br />1.50 <br />4.00 <br />3.00 <br />3.00 <br />WATER CLOSET (WC -1) <br />1 <br />2.5 <br />2.50 <br />- <br />2.50 <br />2.50 <br />- <br />KITCHEN (KS -1) <br />1 <br />3.0 <br />2.25 <br />2.25 <br />3.00 <br />2.25 <br />225 <br />KITCHEN (KS -2) <br />1 <br />3.0 <br />225 <br />2.25 <br />3.00 <br />2.25 <br />2.25 <br />TOTAL <br />16.5013.00 <br />WM� <br />10.50 <br />GPM <br />18.2 <br />16.5 <br />15.0 <br />NOTES AND FIELD CONDITIONS: <br />1. CONTRACTOR TO FIELD VERIFY SIZE AND LOCATION OF (E) CW <br />PIPE TO BE AS INDICATED THESE DRAWINGS. <br />2, CONTRACTOR TO FIELD VERIFY AVAILABLE PRESSURE AT THE <br />POINT OF CONNECTION (POC) TO THE CW SERVICE. POC TO <br />CW PIPE TO BE AS INDICATED IN THESE PLANS AT THE <br />BUILDING WALL. <br />3, CONTRACTOR SHALL VERIFY ACTUAL WATER PRESSURE AND <br />PIPE LENGTHS PRIOR TO CONSTRUCTION. IF PRESSURE IS <br />LESS THAN OR ACTUAL PIPE LENGTH IS MORE THAN LISTED <br />ABOVE, CONTRACTOR SHALL CONTACT THE ENGINEER FOR <br />PIPE SIZING EVALUATION. IF PRESSURE EXCEEDS 80 PSI, F&I <br />A PRESSURE REDUCING VALVE. <br />POTABLE WATER PIPE SIZ NC <br />PIPE <br />SIZE <br />(IN) <br />FLUSH <br />TANK <br />F. U. <br />FLUSH <br />VALVE <br />F. U. <br />FLOW <br />(GPM) <br />Y2 <br />1.0 <br />- <br />3.5 <br />% <br />3.6 <br />- <br />9.0 <br />1 <br />12 <br />- <br />13 <br />11/4 <br />29 <br />8 <br />23 <br />1Y2 <br />60 <br />16 <br />32 <br />2 <br />1 165 <br />78 <br />1 58 <br />GNICH <br />ARCHITECTURE <br />S T U D I O <br />9 SE 3RD AVE, SUITE 110 <br />PORTLAND, OR 97214 <br />V. 503.552.9079 <br />F. 503.241.7055 <br />WWW.GNICHARCH.COM <br />02.11.19 <br />(m <br />CD <br />O <br />'r,,q <br />o <br />W <br />00 <br />00 <br />N <br />n� <br />W <br />C-0 <br />�-1 <br />Q <br />4-d <br />V) <br />6� <br />� <br />U <br />� <br />O <br />� <br />O <br />WM� <br />o� <br />Ngo <br />O <br />QJ <br />_U <br />�--� <br />Q <br />.N <br />O <br />ISSUED FOR PERMIT: <br />02.11.19 <br />SHEET NAME: <br />PLUMBING LEGEND, <br />CALCULATIONS <br />AND SCHEDULES <br />SHEET NUMBER: <br />P1.0 <br />COPYRIGHT 2019 <br />