My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006099
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2403
>
3500 - Local Oversight Program
>
PR0545603
>
ARCHIVED REPORTS_XR0006099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:13:19 PM
Creation date
4/17/2020 2:45:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006099
RECORD_ID
PR0545603
PE
3528
FACILITY_ID
FA0006095
FACILITY_NAME
PETERSON MFG
STREET_NUMBER
2403
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
2403 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A S S 4 C I A T E 5 I N C <br /> In July 1994, a RESNA field geologist observed the drilling of four additional groundwater <br /> monitoring wells (MW4, MW5, MW6, and MW7) at the site to further characterize subsurface <br /> conditions Groundwater samples collected from these additional wells contained no detectable <br /> petroleum hydrocarbons A detailed discussion of the Phase II Subsurface Investigation can be <br /> found in RESNA's "Summary Report, July 1994 Investigation,"dated August 26, 1994 <br /> In PHS/EHD correspondence dated March 1995, regulatory approval was given to sample wells <br /> MW3 and MW5 and wells MW4, MW6 and MW7 on an alternating semi-annual basis MW 1 and <br /> MW2 were to be sampled every quarter, conditions permitting <br /> To further evaluate the extent of residual soil contamination in the vicinity of the former <br /> underground fuel storage tank (UST), Smith Technology supervised the advancement of four soil <br /> borings (SB-1, SB-2, SB-3, and SB-4) on February 29, 1996 to depths of approximately 16 to 26 <br /> feet bgs Total petroleum hydrocarbons as gasoline (TPHg), benzene, toluene, ethylbenzene, and <br /> xylenes (BTEX) were detected above method detection limits at low to moderate concentrations <br /> in samples collected at depths between 10 and 15 feet bgs in borings SB-1, SB-2, and SB-3 A <br /> detailed discussion of this subsurface investigation can be found in Smith Technology's <br /> "Subsurface Investigation Report, " dated April 30, 1996 <br /> . GROUNDWATER MONITORING AND SAMPLING <br /> ATC personnel performed groundwater monitoring and sampling on June 19, 1998 Field work <br /> consisted of measuring the depth-to-water in wells MW 1, MW2, MW3, MW4, MW5, MW6, and <br /> MW7, using an electronic water/product interface probe to deternune if free product was present, <br /> purging and sampling wells MW1, MW3, and MW5 and servicing the passive skimmer placed in <br /> well MW2 <br /> Static groundwater elevations were measured in each monitoring well on June 19, 1998 <br /> Groundwater was measured at an average of approximately 11 91 feet below grade A <br /> groundwater gradient map was created with the June 19, 1998 data using a computer kriging <br /> program The gradient map, presented as Figure 2, depicts a southerly groundwater gradient <br /> averaging 0 006 ft/ft or approximately 31 feet/mile Fluid level measurements indicate <br /> groundwater flow direction beneath the site during this reporting period is generally consistent <br /> with historical data The water table elevation has decreased an average of 2 45 feet since the <br /> previous measurements were collected in March 1998 The March 1998 depth to water <br /> measurements indicated the water table elevation was at the highest elevation reported since the <br /> monitoring program was initiated in March 1992 Groundwater monitoring data are summarized <br /> in Table 1 <br /> On June 19, 1998, groundwater samples were collected by ATC from monitoring wells MW1, <br /> MW3, and MW5 Groundwater samples were collected from the monitoring wells after <br /> • stabilization of pH, electrical conductivity (EC), and temperature All wells monitored were <br /> purged and sampled according to Smith Technology's Quality Assurance/Quality Control Plan on <br /> file with the PHS/EHD A minimum of eight casing volumes of water were removed from each <br /> 943341QUARTLYI2QR-1998 DOC 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.