My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005935
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2711
>
3500 - Local Oversight Program
>
PR0545605
>
ARCHIVED REPORTS_XR0005935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 2:45:16 AM
Creation date
4/17/2020 4:11:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005935
RECORD_ID
PR0545605
PE
3528
FACILITY_ID
FA0003793
FACILITY_NAME
LEARNER COMPANY, THE
STREET_NUMBER
2711
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503009
CURRENT_STATUS
02
SITE_LOCATION
2711 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��Claytori <br /> The groundwater samples did not contain TPH-gas, BTEX, or MTBE above analytical <br /> detection limits Concentrations of diesel were detected in groundwater from each of the <br /> three groundwater monitoring wells at concentrations ranging from 72 pg/L to 540 pg/L <br /> These diesel-range hydrocarbons are within the range detected by analysis of second <br />' quarter 2003 samples Based on the limited diesel fuel impact in the purge water, we <br /> recommend that it be discharged to the local Publically Owned Treatment Works through <br /> the onsite treatment system after approval by the PHD/EHD Groundwater flow direction <br /> is consistent with the second quarter 2003 result The groundwater gradient decreased <br /> from 0 0088 feet/feet to 0 0067 feet/feet this quarter when compared with the second <br /> quarter of 2003 <br />' The next groundwater monitoring event will be conducted as per the requirements of the <br /> PHD/EHD in the fourth quarter of 2003 <br /> 3 <br /> S\Proj\P02263\Q3 Rpt doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.