Laserfiche WebLink
I f <br />' TABLE OF CONTENTS <br /> • <br />' Section Page <br /> 1.0 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br />' <br /> 2.0 COMPLETED ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br />' <br /> 21 Stockpile Sampling and Evaluation 2 <br /> 22 UST Excavation Backfill 3 <br />' 3.0 SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 31 Preparation Duties 4 <br /> 32 Soil and Groundwater Investigation 5 <br />' 3 3 Investigation Documentation 6 <br /> 4.0 PROJECT SCHEDULE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> I <br />' FIGURES <br /> Figure 1 Site Location <br /> Figure 2 Site Plan Showing Former Underground Storage Tanks (Site Layout) <br /> Figure 3 Stockpile-Sample Locations For Impacted Soil From UST Excavation <br /> Figure 4 Site Plan Showing New Above Ground Storage Tanks (Cross-Section of <br />' Excavation Backfill) <br /> Figure 5 Boring Locations (Proposed Geoprobe Locations) <br />' Figure 6 Work Plan Implementation Schedule (Project Schedule) <br />' APPENDICES <br />' Appendix A UST Removal Report dated September 25, 1996 <br /> Appendix B Laboratory Reports <br /> Appendix C Health and Safety Plan <br /> I <br /> I <br /> • The Learner Campari UST fm mliptinn W-riplan <br /> PRF.tx0p97016\97016cal docARev 0(lune!•M7) 1 <br />