Laserfiche WebLink
4 <br /> I <br />' Due to heavy moisture content of the stockpiled soil, 53 cubic yards of imported aggregate base <br /> maternal was utilized to bring the final excavation to grade before constructing a concrete pad for an <br />' above ground storage tank A cross-sectional view of the original UST excavation backfilled with <br /> three different materials is shown on Figure 4 The remaining impacted soil was spread around the <br />' new concrete pad and the access roads leading to various stockpiles of scrap metal within the facility <br /> I <br />' 3.0 SCOPE OF WORK <br />' The scope of this workplan includes duties necessary to prepare and implement the UST Site <br /> Invenigation Workplan Duties include field preparation, soil and groundwater investigation, and <br />' repot preparation and submission to the EHD and the UST Cleanup Fund for review and approval <br />' 3.1 Preparation Duties <br /> 1� <br /> Prior to mobilizing to the field, the contractor vAll review and sign the site specific Health and Safety <br />' Plan(H&SP), which has been prepared for this project The H&SP is included as Appendix C The <br /> H&SP conforms to the standards of Code of Federal Regulations (CFR) 1910 20 The H&SP <br />' dismsses the contamination known to be present at the site, and provides guidance to investigation <br /> personnel for the purpose of protecting health and safety <br /> 1 <br /> Soil boring permits from the EHD will also be acquired for the investigation Permits will be <br />' acquired based on installing a minimum of eleven geoprobe borings, which will be installed as <br /> spec6ed in Section 3 2 Additionally, Underground Alert will be notified prior to the installation of <br />' any soil borings <br /> 1 <br /> • The Lcar ff Company-LST Em e-aigaLnn WorLplan 4 <br />' PRE tz%c�7+M9701C+ca1 dnc%Rcv 0(June 1497) <br />