My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005948
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2711
>
3500 - Local Oversight Program
>
PR0545605
>
ARCHIVED REPORTS_XR0005948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 1:56:13 AM
Creation date
4/17/2020 4:16:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005948
RECORD_ID
PR0545605
PE
3528
FACILITY_ID
FA0003793
FACILITY_NAME
LEARNER COMPANY, THE
STREET_NUMBER
2711
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503009
CURRENT_STATUS
02
SITE_LOCATION
2711 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />' The geoprobe technique recovers very small quantities of soil and groundwater Wash water, <br /> recovered soil, and groundwater will be placed into the appropriate storage containers pending <br /> analytical results Once analytical data has been received, the material will be handled appropriately <br /> I <br /> 3.3 Investigation Documentation <br /> I <br /> An investigation report will be prepared, which documents all field and preparation duties Maps of <br /> all sampling locations will be provided, as will tabular data presentations for soil and groundwater <br /> data The report will contain, at a minimum, the following sections <br /> • Objectives <br /> • Background <br /> • Field Investigation including regional and site geology <br /> • Sample Results <br /> I� Conclusions <br /> • Recommendations <br /> 1 <br /> Copies of chains-of-custody, laboratory results, and boring logs (if completed) will be appended <br /> 1 <br />' 4.0 PROJECT SCHEDULE <br /> Clayton anticipates that the scope of work will require approximately two months (60 days) to <br /> complete once approvals are secured A proposed schedule is included as Figure 6 The schedule <br />' start date will depend upon the date of approval for this workplan <br /> 1 <br /> . the Lcuner Cn nrerr-UST Invir-aipunn Workplan <br /> FPy !°RE iff0 9701aQ- 'Sca1 dnclRc% O(lune 1997) 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.