Laserfiche WebLink
I <br />' The geoprobe technique recovers very small quantities of soil and groundwater Wash water, <br /> recovered soil, and groundwater will be placed into the appropriate storage containers pending <br /> analytical results Once analytical data has been received, the material will be handled appropriately <br /> I <br /> 3.3 Investigation Documentation <br /> I <br /> An investigation report will be prepared, which documents all field and preparation duties Maps of <br /> all sampling locations will be provided, as will tabular data presentations for soil and groundwater <br /> data The report will contain, at a minimum, the following sections <br /> • Objectives <br /> • Background <br /> • Field Investigation including regional and site geology <br /> • Sample Results <br /> I� Conclusions <br /> • Recommendations <br /> 1 <br /> Copies of chains-of-custody, laboratory results, and boring logs (if completed) will be appended <br /> 1 <br />' 4.0 PROJECT SCHEDULE <br /> Clayton anticipates that the scope of work will require approximately two months (60 days) to <br /> complete once approvals are secured A proposed schedule is included as Figure 6 The schedule <br />' start date will depend upon the date of approval for this workplan <br /> 1 <br /> . the Lcuner Cn nrerr-UST Invir-aipunn Workplan <br /> FPy !°RE iff0 9701aQ- 'Sca1 dnclRc% O(lune 1997) 6 <br />