My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013168
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
23809
>
2600 - Land Use Program
>
QX-88-1
>
SU0013168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2020 11:42:00 AM
Creation date
4/23/2020 11:12:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013168
PE
2600
FACILITY_NAME
QX-88-1
STREET_NUMBER
23809
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
Zip
95240-
APN
02316002
ENTERED_DATE
4/14/2020 12:00:00 AM
SITE_LOCATION
23809 E BRANDT RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oFQUIIV°� SAN JOAQUIN COUNTY <br /> °Z DEPARTMENT OF PLANNING AND BUILDING INSPECTION <br /> a..aoe <br /> ! 1810 E. HAZELTON AVE., STOCKTON. CA 95205 CHET DAVISSON <br /> 4.i 60 PLANNING PHONE: 209/944-3722 Director <br /> BUILDING PHONE: 209/944-3701 <br /> JERRY HERZICK <br /> Deputy Director <br /> TOM WALKER <br /> Deputy Director <br /> September 9 , 1987 <br /> MEMORANDUM <br /> TO: Development Committee <br /> FROM: Planning Division <br /> SUBJECT: Pre-Application Conference for Quarry Excavation <br /> Application No. QX-88-1 <br /> ------------------------------------------------ <br /> The above-mentioned Quarry Excavation application was submitted <br /> for a Quarry to excavate approximately 8 million cubic yards of <br /> sand, gravel and placer gold. The excavation area is approximately <br /> 500 acres, and the project is tentatively scheduled to be implemented <br /> over a 30 year period. <br /> Planning staff has reviewed this pre-application and offers the <br /> following comments: <br /> Drainage: <br /> 1 . Drainage calculations are needed for each phase. The application <br /> should also include what effects this operation may have on <br /> siltation, off-site flooding, and the disruption of existing <br /> vegetation. <br /> 2 . All drainage courses should be shown on the cross-sections. <br /> According to our records , a stream course bisects the subject <br /> site. This should be shown on the site plan, and it should <br /> be indicated if the stream carries any measurable flow of <br /> water. Indicate if any proposed excavation activities will <br /> be in the stream course area. <br /> 3 . With reference to cross-section 6 , what is the dip? Is an <br /> intermittant watercourse being eliminated? If so, what will <br /> the effects be? <br /> 4 . The post-project drainage both onto and through the site need <br /> to be addressed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.