Laserfiche WebLink
QX-88-1 page 2 <br /> Cross-Sections : <br /> 1 . Add cross-sections across the entire length and width of the <br /> areas to be excavated. <br /> 2 . Add cross-section details for the gas line, PG&E easement, <br /> and EBMUD aqueduct (see attached letter) . <br /> 3 . Indicate final elevations at both ends of cross-section details. <br /> 4 . Cross-sections should show where any stock-piling of overburden <br /> will be located. No stockpiling is permitted within 25 feet <br /> of any property lines (per Section 9-2244 (b) . <br /> 5 . Final elevations within 25 feet of any property boundary shall <br /> be equal to or greater than the abutting property unless the <br /> elevation prior to excavation is less than that of the abutting <br /> properties , in which case, the differential shall not be in- <br /> creased (per Section 9-2244 (L) ) . <br /> 6 . The cross-sections should show the full extent of the location <br /> of all overburden (the cross-sections as shown now indicate <br /> overburden on the crests of hills) . <br /> 7 . Indicate property boundaries on the cross-sections. This <br /> can be done either to scale, or where impractical, by indi- <br /> cating with the following symbol and noting the cor- <br /> responding distance in feet. <br /> Operational Characteristics: <br /> 1 . EBMUD should be contacted to establish a legal crossing of <br /> the aqueduct for the quarry operation (see attached letter <br /> from EBMUD) . <br /> 2 . A full description of the quarry operations and any on-site <br /> processing of sand, gravel, and gold is needed. Details of <br /> all equipment and facilities used should be included. <br /> 3. What will be the hours of operation for both the excavations <br /> and any on-site processing? Section 9-2244 (f) prohibits oper- <br /> ations between 9 : 00 p.m. and 5 : 00 a.m. except if modified <br /> by the review authority. <br /> Site Plan: <br /> 1 . Outline property boundaries and show the private road on the <br /> vicinity map. <br /> 2 . On the aerial map lightly shade the areas to be excavated <br /> with cross-hatching. <br /> 3 . Staff recommends that the limits of excavation be modified <br /> to further minimize the elimination of trees and to conform <br /> to the natural contours . The applicant may wish to consider <br /> limiting the excavated area of Phases 1-23 to that portion <br /> of the property on the west of the 200 ' wide PG&E easement. <br />