QX-88-1 page 3 <br /> 4 . The application notes that the gas line may have to be relocated <br /> to facilitate excavation. In the event that the line is moved, <br /> how will it be moved, and where will its new location be? <br /> 5 . The site plan should indicate the time period for each phase <br /> (i. e. "1 year per phase" ) . <br /> 6 . Calculations are needed for each phase indicating the approxi- <br /> mate amount of overburden to be removed, and material to be <br /> excavated. <br /> 7 . When the full application is submitted, please submit a total <br /> of 15 copies of the application (instead of the usual 10 copies) <br /> in order to accomodate an expanded referral list. <br /> Reclamation Plan: <br /> 1 . Show the actual sequencing of reclamation, how the phasing <br /> will be done, where the overburden will be stockpiled, finished <br /> slopes, and the details for revegetation. Detailed information <br /> on the permanent reclamation and landscaping is necessary. <br /> 2 . An assessment of the effect of implementation of the reclamation <br /> plan on future mining in the area is necessary (per SMARA <br /> Section 2772 , refer to attached letter from the Division of <br /> Mines and Geology) . <br /> 3 . Any stockpiles of overburden that are expected to be stockpiled <br /> for longer than one year shall be temporarily revegetated <br /> to minimize water and wind erosion (per CAC Section 3502 , <br /> refer to attached letter from the Division of Mines and Geology) . <br /> Financial Guarantee: <br /> 1 . Provide a dollar proposal. <br /> 2 . Provide the calculations used for the proposal, including <br /> dollar estimates for time, material, and equipment. <br /> Conclusion: <br /> Based upon the scale and extent of the excavation proposed, and <br /> the large amount of habitat and topography to be modified, the <br /> preparation of an Environmental Impact Report may be necessary <br /> for this project. <br /> The Reclamation Plan could be included in the EIR, and could serve <br /> to implement the mitigation measures of the EIR. It should be <br /> noted that an environmental assessment (Initial Study) has not <br /> been done for this pre-application, but would be done soon after <br /> the full application is submitted. At that time, staff may deter- <br /> mine that a full EIR is appropriate. <br /> KS: jdh <br />