Laserfiche WebLink
23 June 2001 <br /> AGE-NC Project No 99-0592 <br /> Page 4 of 4 r <br />' 5.0. RECOMMENDATIONS <br /> Based on the results of this investigation, AGE recommends continued quarterly monitoring of <br />' MW-1 and DW-1 The next quarter morntonng event should be scheduled for September 2001 <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br />' conditions at the site for the purpose of this investigation`are made from a 'hriuted number of <br /> available data points (i e monitoring well and domestic well ground water samples) and subsurface <br /> conditions may vary away from these data points No other warranty, expressed or implied, is made <br />' as to the professional recommendations contained in this report <br /> I , <br /> 1 <br /> 1 <br /> 1 , <br /> Advanced GeoEnvironmental,Inc <br /> y <br />