Laserfiche WebLink
r19 January 2006 <br /> • AGE-NC Project No 99-0592 <br /> rPage,4 of 4 <br /> r 30 August 2004, the EHD has responded by letter dated 15 March 2005, requiring site fate and <br /> transport study of fuel compounds as well as TCE and PCE Pending site closure,AGE recommends <br /> continued quarterly ground water monitoring The next monitoring event was performed in <br /> rDecember 2005 <br /> r6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> r environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br /> r points(i e ,monitoring wells and ground water samples)and subsurface conditions may vary away <br /> from these data points No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions and recommendations contained in this report <br /> r <br /> ri <br /> r <br /> r <br /> r , <br /> r <br /> r <br /> r <br /> r <br /> i <br />' Advanced GeoEnvironmental,Inc <br />