My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 10:15:16 AM
Creation date
4/27/2020 9:49:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ECEIVED <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK MAY 2 4 2013 <br /> MONITORING PLAN-(Page 1 of 2 <br /> TYPE OF ACTION ❑1.NEW PLAN CHANGE OF INFORMATION E 490-1 <br /> PLAN TYPE VPI.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item onT 2,THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( • <br /> J. *AM'.Y INFORMATIQN`. <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Sante as FACILITY NAME) 3. <br /> BUSINESS'SITE nDDRESs %-?,t � � 103. CITY 104• <br /> II,EQUIPMENT TESTING AND PREVENTM MAIN.TENANGE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,linc:leak detectors,etc.)must be performed at(hc frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,204,2638,2641 <br /> MONITORING EQUIPMENT IS SERVICED 'L ANNUALLY ❑ 99.OTHER(Specify): 49"a <br /> 490.36 <br /> TIL MOINITORINGLOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH Tffi5 PLAN. SITE PLOT PLANIMAP PREVI <br /> 363490-4 OUSLY SUBMITTED. (23 CCR'§2632, <br /> IV.TANK`MONITORING ISPERFORMED.USING:THE FULLOVYING-METHOD(S): - <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a DRY &b.LIQUID FILLED ❑ C.PRESSURIZED ❑d.UNDER VACUUM 4906 <br /> PANEL MANUFACTURER: 1,7>�� 490-7. 0-90-9 <br /> 2-t MODEL#: - 3s'�� <br /> LEAK SENSOR MANUFACTURER: u 49". 49a-1 <br /> MODEL#(S):�W'F <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL.TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: - 49012. MODEL#: t 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14' MODEL#(S): ( 49045 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> dMONTHLY <br /> ------ ❑ e.OTHER(Sp-ecify): 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.ph. ❑ c.OTHER(Specify): i -�� 490.18 <br /> 49949 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-22 <br /> 49023 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 499:24 <br /> 490-2S <br /> ❑ <br /> 99.OTHER (Specify): <br /> 490-26. <br /> 490.27 <br /> V.PIPE MQNITOItING IS:PERFOR1VIlJD.U$;N THE FULLOvmG METFIOD(S);(Check A tha't::aPPiY) <br /> El 1.CONTINUOUS MONITORING OF PIPE(PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-29 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> - SECONDARY CONTAINMENT IS:❑a_DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> PANEL MANUFACTURER: 4900-° MODEL#: ` 49x31 <br /> LEAK SENSOR MANUFACTURER: 490-32 MODEL#(S): 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a,YES ❑b.NO 490.34 <br /> FAILUREJDIS,CONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR§2636) 490.36 <br /> MLLD MANUFACTURERS: 490-37--- 490 gs <br /> O MODEL#S): <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> ELLDMANUFACTURERS) f-0-L 490.40. MODEL#(S): e4 Q--e DCT 4490-41 <br /> PROGRAMMED IN LINE LEAK TEST: J4 1.MINIMUM MONTHLY 02 g.p.h, ❑ 2.MINIMUM ANNUAL 0.1 gp.h. - 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. [mit YES ❑b.NO 490-47 <br /> ELLD FAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. aia YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 49a4s <br /> TEST FREQUENCY ❑ a_ANNUALLY b.EVERY 3 YEARS El c.OTHER(Specify) 490-46 49047 <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN,MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> •Mowed for atonilorin orunburied me unemtor fuel piping only HSC 75281-5@ 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)]. 490.50 <br /> LJ 7.NO REGULATED PIPING PER HEALTH AND:SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99.OTHER(Specify) 490 s2 <br /> 490-53 <br /> UPCF UST-D(12/2007)114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.