Laserfiche WebLink
J - <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI iJ1NDF,R DISPENSgpl:CONTAINMEN P(UDC MONI`I BRING <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54 <br /> [R'1.CONTINUOUS ELECTRONIC MONITORING El2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490.546 <br /> ❑.4.NODISPENSERS 099.OTHER(Specify)` <br /> PANEL MANUFACTURER90" ago ss .:MODEL#: "Tree,• 3 S":D 490-56. <br /> LEAK SENSOR MANUFACTURER: 490-57 MODEL#(S): 9 rj- O 490.58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS P*YES ❑b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN Ott a YES ❑b.NO 490-so. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM'TRIGGERS AUTOMATIC PUMP SHUTDOWN. q-a.YES ❑b.NO 490-61 <br /> UDC MONITORING.STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS 31.SINGLE-WALLED ❑2.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: 49"U <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQUID El 2.PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b.NO 490-64b <br /> ,VLL:PEItIODTC SYSTEM�STA�TG :.' <br /> ❑ 1.ELD TESTING.THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.0. <br /> LEAK DEN LD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED (23 CCR¢26441) <br /> .SECONDARY CONTAINMENT COMPONENTS ARE TESTED EWRY36 MONTHS. 490.66 <br /> SPILL BUCKETS ARE TESTED ANNUALLY. 49067 <br /> • ' ,.VIII:R�CQRDKEE$ING ;:. <br /> The following monitoring/maintenance records arc kept for this facility: <br /> Alarm logs 490.69a [3spal <br /> Vilnspection Records 490-6ab ❑Tank integrity testing results 49o4oc <br /> ❑SIR testing results(and supporting documentation records). 490-6ad ❑ Tank gauging results(and supporting documentation records). 490.686 <br /> ❑ATG Testing results(and supporting documentation records).49&68f ❑Corrosion Protection 60-flay logs 4"S <br /> quipment maintenance and calibrationrecords.49"gh <br /> TX.TRAINING. <br /> IAPersonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 49049a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490.69b <br /> ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required).49os9e <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69. <br /> ❑ STATE WATER RESOURCES.CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49"9f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):,M69k M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> > The facility employee's role with regard to spills and overfills as.specified in the UST Response Plan <br /> Names:of contact person(s)for emergencies and monitoring alarms.490.7o <br /> X. CQMMENTS%AADZTIONAL1NFORM1TIQN <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br /> XI.PERSONNEL RESPONSEWLITIES- <br /> The UST Owner/Operator is responsible for ensuring that:1),the daily/routine UST monitoring activities and maintenance of UST leak detection equip!!i <br /> by <br /> this plan occurs,2)all conditions that indicate a possible release ate investigated,and 3)all'monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME. 490-72 TITLE <br /> NAME 70- <br /> 490-74 TITLE 0.75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and infoim the owner/operator of any <br /> conditions that need follow-up action. <br /> 'XII.OWN MOPERATOR:SIGNATURE <br /> CERTIFICATION:I certify that,the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490-76 DATE: 490-77I i O r r u' <br /> APPLICANT NAME(print): 490-78 APPLICANT TIME: 490.79 <br /> UPCF UST-D(1212097)3/4 <br />