Laserfiche WebLink
i. c► <br /> jNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN ® 2.CHANGE OF INFORMATION MAY 17 2011490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 491 z <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEMO <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) Arco Manteca 3. <br /> BUSINESS SITE ADDRESS 1711 E.Yosemite Ave 103, CITY Manteca 104. <br /> U.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR§2632,263412638,2641)------_- ---!___---- --------------_- -- ___--- -__---- <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY [199.OTHER(Specify): 4W3b <br /> M.MONITORING LOCATIONS <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 112.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490.0- <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490 6 <br /> -- - - ----_----- -------- ---- - -- - ------ --------------- ---- -- <br /> PANEL MANUFACTURER: Veeder Root 4111. MODEL#: TLS-350 48 <br /> --------------------------------_-----------___-_-__ -----------_-------------- <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490'9 MODEL#(S): 794390-409 ago-lo <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCK§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 495-14 MODEL 490-15 <br /> ----------------------------------- ---- ------------------------ - ------------ ------ <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 495-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 495-17 <br /> - ----------------------------------- ---------------------------------- <br /> PROGRAMMED TESTS: ❑ a.0.l h. ❑ b.0.2 h. ❑ c.OTHER(Specify): 495-19 <br /> g•p• g•P• fY) 0-91-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-25 <br /> El 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: E] a.36HOURS El b.60 HOURS a90-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: [Ia.ANNUALLY C] b.BIENNIALLY E] c.OTHER(Specify): 4900-25 <br /> ®99.OTHER (Specify): mplicity 490-26 <br /> Si <br /> 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ®1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 495-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 495-29 <br /> --------- ------------------ ------ ------------ - - ------------------------------------------- <br /> PANEL MANUFACTURER: Veeder Root 490.31 MODEL#: TLS-350 490.31 <br /> - ----490-32490.37 <br /> LEAK SENSOR MANUFACTURER: Veeder Root--_ -- ---__ _ MODEL#(S):- 794380-208 <br /> ------------------------------ - - ------------------ <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490.35 <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR2636 -_- 491-36 <br /> MLLD MANUFACTURER(S):Regular-FE PETRO/Plus and Premium-VAPORLESS ago 37 MODEL#(S):Regular STP-MLD 490 3B <br /> Plus and Premium-LD2000 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) -495-39 <br /> -------------------- ----- - ------------------- - -- ----- - <br /> ELLD MANUFACTURERS 490.40• MODEL#(S): 49x41 <br /> ( ) --- -- - T- -- -- --- - <br /> PROGRAMMED IN LINE LEAK TEST: El1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YF.S ❑b.NO 490-43 <br /> ELLD FAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 495x4 <br /> ❑ 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FRE UENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490.4649047 <br /> 5.VISUAL PIPE MONITORING. 490.49 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MM.MONTHLY&EACH TIME SYSTEM OPERATED• 490.49 <br /> •Allowed for nioniloring orunburied emergency enenlor fuel piping only per HSC§25291.5 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(x)(3)1. 49°-50 <br /> El 7. 140 REGULATED PIPING PER HEALTH AND SAFETY CODE,DMSION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 490.52 <br /> ❑ 99.OTHER(Specify) 490.53 <br /> UPCF UST-D(12/2007)1/5 <br />