Laserfiche WebLink
SW RCB, January 0 <br />2002 DRAFT ag of <br />1 1 �, ► TESTING- <br />CONTAINMENT 1 <br />Test Method Developed By: El UDC Manufacturer E] Industry Standard Professional Engineer <br />i <br />■ Other 1 <br />Test 1 • Used: ■ Pressure ■Vacuum ■ Hydrostatic <br />■ Other F' <br />Test Equipment Used: <br />Equipment Resolution: <br />���t <br />{\aCTr1,`;Ya£>�1`;,i;-�r�`;`r'`2e1k4�ukl`\��t�Y;� <br />i asr ti.z 11uT4#,. �er"r�5,i� <br />�rs.zc. ��T4,?; t �x1, �., �\.x1rY,\ •T a} �r `t?<}.l;�-1Lax?,r 1`,�te.u„`...4 ....,��,am�S3, <br />sx'rti,a,_.'1.S � } _.\�,'..� Yc_ � <br />Y,a�.�.r4'��.\.\ `�c\ { t1>�s�2,if.�. .} �, Z Y�Sx���, `�Y`,., �� �” ����x,i�.1�„`1..i.,?.,� �`�YU*..�a� . ai4ec 4v,3t�x,2c�x: tY�fi�,iR�r�,i4 rvx��,>. <br />I <br />�`T`:., �_:�,'�.ft :....Z::a.,��1�_\a__�i,__1�?.`i\ti�t�.'�l_r�,4t:'�+,T`�\�u_``_.,4?_. .,.:_.._r _ �.a��x f;'»�, .,\�.\\_uh,. ft'e,.e?—,,:z<,kt i`,tr,1_1 u ,�1�.. �� ,�a,, <br />49 ��.w\ <br />MINI . <br />1 <br />" ...,. v,e <br />Sar..s...t.i._:em�\..T.....k0. v�.. Shu§,.T <br />r. „ENr.•e,t,a,. <br />�. IN, <br />i <br />, ------ <br />❑Yes ❑No ®NA <br />-- — <br />- ----- <br />❑Yes ❑No ®NA <br />for testing? <br />Fiberglass <br />MEmn-, <br />i <br />Fiberglass <br />❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ®No ®NA <br />❑Yes []No ®NA <br />verified functional after testing? <br />Height from Bottom 1 Top <br />of Highest Piping Penetration: <br />1 11 <br />1 11 <br />1 11 <br />1 11 <br />Height from 1. to <br />Lowest Penetration: <br />1 11 <br />i 11 <br />1 11 <br />1 11 <br />Condition of U1VC prior 1 <br />product!!1 Does turbine shut d when <br />UDC sensor detects liquid (both <br />I <br />INA <br />es ]a <br />Is system rammed for fall- <br />1..• wn—safe <br />I', Orr <br />Was fail-safe verified t* be <br />11"..... <br />F�Yes E]No ZNA <br />Wait time ► apppressure/vacuulying <br />1starting test:. <br />i <br />Initial Reading <br />------ <br />'ii Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />1. 1 - 1'•. 1 1. N t <br />� <br />Pass/Fail Threshold or Criteria: <br />Test Result <br />Pass Fail <br />Pass Fail <br />Pass Fail <br />Pass Fail <br />Was sensor removed or disabled <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes [:]No ®NA <br />❑Yes ❑No ®NA <br />for testing? <br />Was sensor properly replaced and❑Yes <br />❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ®No ®NA <br />❑Yes []No ®NA <br />verified functional after testing? <br />Comments — (Include information on repairs made prior to testing, and recommended follow-up for failed tests.) <br />*Piping could not be isolated at the dispenser pans as secondary pipe is drilled just inside the penetration boots at a point to low for <br />the test boots to cover. This was possibly done to allow a lower drainage from within the sump. This would not allow a test of the <br />dispenser sumps as well. The owner is already taking bids for dispenser upgrades to include new under dispenser containment <br />dispenser pan sensors. <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO", then the entire UDC should be tested. (See SWRCB LG -160) <br />