Laserfiche WebLink
0 0 <br />SWRCB, January 2002 FINAL DRAFT Page 4 of 7 <br />5. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Sump Level Change Indicator Equipment Resolution: 0.0025" <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Sump # 1 <br />Sump # 2 <br />Sump # 3 <br />Sump # <br />Test Start Time: <br />87 Unleaded <br />89 Unleaded <br />92 Unleaded <br />Sump Diameter: <br />42" <br />42" <br />42" <br />Sump Depth from Top of Tank: <br />28.50" <br />28.50" <br />29.50" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />17.50" <br />22.50" <br />24.00" <br />Highest Piping Penetration: <br />0.00" <br />0.00" <br />-0.15 <br />Height from Tank Top to Top of <br />11.50" <br />3.00" <br />12.50" <br />Lowest Electrical Penetration: <br />®Pass ❑Fail <br />®Pass ❑Fail <br />❑Pass ®Fail <br />❑Pass [-]Fail <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Dry <br />❑Yes [:]No ❑NA <br />Depth of Sump Tested' <br />19.25" <br />23.50" <br />25.50" <br />❑Yes ❑No ❑NA <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />®Yes [:]No ❑NA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes []No [:INA <br />product and water)? <br />Turbine shutdown response time: <br />20 Seconds <br />20 Seconds <br />20 Seconds <br />Is system programmed for fail-safe <br />®yes ❑No [INA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />shutdown?` <br />Was fail-safe verified to be <br />®yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />11:25am <br />9:45am <br />10:40am <br />Initial Reading (Rj): <br />19.25" <br />23.50" <br />25.50" <br />Test End Time: <br />12:00pm <br />10:20am <br />10:55am <br />Final Reading (RF): <br />19.25" <br />23.50" <br />25.35" <br />Test Duration: <br />35 Minutes <br />35 Minutes <br />15 Minutes <br />Change in Reading (RF -RI): <br />0.00" <br />0.00" <br />-0.15 <br />Pass/Fail Threshold or Criteria: <br />0.00" <br />0.00" <br />0.00" <br />Test Result <br />®Pass ❑Fail <br />®Pass ❑Fail <br />❑Pass ®Fail <br />❑Pass [-]Fail <br />Was sensor removed for testing? <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />®Yes []No ❑NA <br />❑Yes [:]No ❑NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®yes [:]No❑NA <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Comments — (Include information on repairs made prior to testing, and recommended follow-up for failed tests.) <br />Level was retested on pump out and was able to hold at 13" level, just below highest conduits. Customer to have repairs made <br />during upgrade work in first quarter of the new year. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to a_y of the questions indicated with an <br />asterisk (*) is "NO", then the entire sump should be tested. (See SWRCB LG -160) <br />