Laserfiche WebLink
.�I.fat ril LIa o.ILI Let W 0o <br />This monitoring program must be kept at the UST location at all times. The <br />information on this monitoring program are conditions of the operating permit. The <br />permit holder must notify P 4V IN , Environmental Health Division <br />phone L4(og- y within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. Required <br />by Sections 2632(d) and 2641(h) CCR. <br />Facility Name:_ <br />Facility Address: 15 <br />A. Describe the frequency of performing the monitoring: <br />Tank c T t4-(' S N yjT 1tjV0Q-C 6 ) <br />ZE <br />mm7l'V, <br />+ `� <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank ► `i- l S I 0 0'0 <br />I id• • . Imoi• <br />C. Describe the location(s) where the monitoring will be performed (facility plot <br />plan should be attached): <br />L t Nyv ee ) r-JTUK AIN L s E. L 0 <br />D. List the name(s) and title(s) of the people responsible for performing the <br />monitoring and/or maintaining the equipment: <br />E. Reporting format for monitoring: <br />Tank <br />• < .::. P <br />0 <br />TW <br />mum <br />F. Describe the preventive maintenance schedule for the monitoring equipment. <br />Note: Maintenance must be in accordance with the manufacturer's maintenance <br />schedule but not less than every 12 months: 3 nN (� N in O)W (- <br />�1\ e m °1- &)AAyu IL- `tL S F O 2y T E ora � 0 r OPP ` O <br />TL b'k+" I (/\ Gof S I N OV N 1, 6 A N VERVI <br />G. Describe the training necessary for the operation of the UST system, including <br />piping and the monitoring system: VO2 S Z Yt C <br />62s Pe* � &J 1 A," Y� kPJ adv CA " I--)40 YD S 0r4I I W I rq & R C,-- <br />