Laserfiche WebLink
NEW U NINSPEMON REC=D <br />TMEM,1 r <br />malru 5. TANK APPROPRIATELY PLACED WITH BACKFILL <br />r: <br />HOLIDAY: <br />BRIMEMIQUID ): OTHER: <br />MRS/HIM: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />FINAL INSPECTION <br />5-31' <br />A <br />I <br />(CCR 2632 (C) (2)) <br />P <br />N <br />ALL TANKS TO BE INSTALLED AID TESTED IN ACCORDANCE <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />- <br />R <br />T <br />(CCR 2635 (B) (5)) <br />d <br />O <br />I <br />(CCR 2635 (B) (6)) <br />V <br />A <br />(CCR 2635 (E) (2)) <br />E <br />L <br />(CCR 2631 (D) (5)) <br />l„19. <br />D <br />S <br />(CCR 2635 (A) (5)) <br />20. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />21. <br />"C- FORM COMPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />- <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />&23. <br />t <br />ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />TMEM,1 r <br />malru 5. TANK APPROPRIATELY PLACED WITH BACKFILL <br />r: <br />HOLIDAY: <br />BRIMEMIQUID ): OTHER: <br />MRS/HIM: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />FINAL INSPECTION <br />5-31' <br />12. <br />PERF CE TEST FOR -ALL- MONITORING PROBES <br />(CCR 2632 (C) (2)) <br />13. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />14. <br />PERFORMANCE TEST OF LIN: LEAK DETECTION <br />(CCR 2632 (D) 2635 (B) (5)) <br />- <br />15. <br />PERFomum TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR 2635 (B) (5)) <br />d <br />16. <br />BALL FLOAT VALVES INSTALLED <br />(CCR 2635 (B) (6)) <br />17. <br />OVERFILL PROTECTION INSTALLED/ <br />(CCR 2635 (E) (2)) <br />18. <br />TANK ACCESS PORTS BROlUGHT TO GRADE (LOCKED AND WATERTIGHT) <br />(CCR 2631 (D) (5)) <br />l„19. <br />TANK INTEGRITY TEST (PASSING HARD COPY) <br />(CCR 2635 (A) (5)) <br />20. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (E) (1) (2)) <br />21. <br />"C- FORM COMPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />- <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR 2641-2644) <br />&23. <br />t <br />ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br />(B+S CODE 25284 (E) (F)) <br />C0IWNTS: <br />EH23-006 3/92 <br />