Laserfiche WebLink
NEW USWTALLATION INSPECTION RECMD <br />CAPACITY: PRODUCT: R.E.M.S: <br />=QmUa <br />EM 0Ul <br />'9 <br />HOLIDAY: <br />BRINE(LIQUID ): OTHER: <br />NRS/NIN: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />6- <br />A <br />I <br />7. <br />SECONDARY PIPING CONTAINMENT TEST 400THER: <br />p <br />M <br />ALL TAXIM TO BE INSTALLED IUD TESTED IM ACCORDANCE <br />p <br />I <br />WITH NAMOFACTURER WRITTEN SPECIFICATIONS <br />�10. <br />R <br />T <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />O <br />I <br />V <br />A <br />E <br />L <br />D <br />S <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />I. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (a) <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />=QmUa <br />EM 0Ul <br />'9 <br />HOLIDAY: <br />BRINE(LIQUID ): OTHER: <br />NRS/NIN: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />6- <br />PRIMARY PIPING TEST (MINIMM 40 PSI/30 HIM) <br />(CCR 2635 (8) (4)) <br />7. <br />SECONDARY PIPING CONTAINMENT TEST 400THER: <br />(CCR 2635 (A) (4)) <br />9. <br />LMJSED TANK OPENINGS SEALED AM CORROSION PROTECTED <br />(CCR 2635) <br />�10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR 2M (A) (4)) <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR 2635 (B)) <br />COMMENTS: <br />EH23-006 3/92 <br />