My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW USWTALLATION INSPECTION RECMD <br />CAPACITY: PRODUCT: R.E.M.S: <br />=QmUa <br />EM 0Ul <br />'9 <br />HOLIDAY: <br />BRINE(LIQUID ): OTHER: <br />NRS/NIN: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />6- <br />A <br />I <br />7. <br />SECONDARY PIPING CONTAINMENT TEST 400THER: <br />p <br />M <br />ALL TAXIM TO BE INSTALLED IUD TESTED IM ACCORDANCE <br />p <br />I <br />WITH NAMOFACTURER WRITTEN SPECIFICATIONS <br />�10. <br />R <br />T <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />O <br />I <br />V <br />A <br />E <br />L <br />D <br />S <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />I. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (a) <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />=QmUa <br />EM 0Ul <br />'9 <br />HOLIDAY: <br />BRINE(LIQUID ): OTHER: <br />NRS/NIN: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />6- <br />PRIMARY PIPING TEST (MINIMM 40 PSI/30 HIM) <br />(CCR 2635 (8) (4)) <br />7. <br />SECONDARY PIPING CONTAINMENT TEST 400THER: <br />(CCR 2635 (A) (4)) <br />9. <br />LMJSED TANK OPENINGS SEALED AM CORROSION PROTECTED <br />(CCR 2635) <br />�10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR 2M (A) (4)) <br />ALL PIPING AND FITTINGS CORROSION PROTECTED <br />(CCR 2635 (B)) <br />COMMENTS: <br />EH23-006 3/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.