Laserfiche WebLink
MONIT ING SYSTEM CERTI ATION <br />CERTIFICATION /TEST DATE: May 26, 2009 <br />Al. FACILITY A2. OWNER <br />Name Quik Stop Market #132 Name Quik Stop Markets, Inc. <br />Address 3555 W. Hammer Lane, Stockton, CA 95219 Address 4567 Enterprise Street, Fremont, CA 94538 <br />Phone s 510-657-8500 Phone # 510457-8500 <br />Contact Michael Karvelot Contact Michael Karvelot <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ■ Check this box If tank gauging Is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment Is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />COmDiete the followinq checklist: <br />■M <br />I* In Section H below, describe how and when these deficiencies were or will be corrected. I <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box If LLD& are not installed. <br />Complete the following checklist: <br />■ <br />Yes <br />❑ <br />No <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ <br />Yes <br />❑ <br />No * <br />Has all Input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No * <br />Were all tank gauging probes visually Inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No * <br />Were all probes reinstalled property? <br />❑ <br />Yes <br />❑ <br />No * <br />Were all Iterns on the equipment manufacturers maintenance checklist completed? <br />■ <br />NIA <br />■M <br />I* In Section H below, describe how and when these deficiencies were or will be corrected. I <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box If LLD& are not installed. <br />Complete the following checklist: <br />■ <br />Yes <br />❑ <br />No <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ <br />WA <br />(check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />■ <br />Yes <br />❑ <br />No * <br />Were all LLD* confined operational and accurate within regulatory requirements? <br />■ <br />Yes <br />❑ <br />No " <br />Was the testing apparatus property calibrated? <br />■ <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow If It detects a leak? <br />❑ <br />NIA <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />■ <br />NIA <br />❑ <br />Yes <br />❑ <br />No " <br />For electronic LLDa, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />■ <br />NIA <br />or disconnected? <br />❑ <br />Yes <br />❑ <br />No * <br />For electronic LLDs, does the turbine aut nutically shut off if any portion of the monitoring system malfunctions <br />■ <br />WA <br />or fails a test? <br />❑ <br />Yes <br />❑ <br />No " <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />■ <br />WA <br />■ <br />Yes <br />❑ <br />No " <br />I Were all items on the equipment manufacturers maintenance checklist completed? <br />' In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />Page 3 of 3 <br />