Laserfiche WebLink
B. Finishing: <br /> 1. Two 5 gallon containers of wash tank sludge were labeled but not <br /> legible. <br /> Corrections: <br /> The Finishing Department affix New Labels with Legible Writing on them. <br /> C. Maintenance: <br /> 1. One 5 gallon container of hazardous waste was labeled, but the <br /> accumulation start date and generator information was not clearly marked. <br /> Corrections: <br /> The Maintenance Department affix a New Label with Legible Writing on it. <br /> Effective immediately label all containers of hazardous waste according to <br /> referenced code section. <br /> #21 The following containers of hazardous waste were not kept closed. <br /> A. Fabrication: <br /> 1. One 55 gallon container of rollform sludge. <br /> Corrections: <br /> The Fabrication Department(Foremen, Leadmen, and Rollform Operators) was <br /> informed that the Containers must have the Lid on at all time except when adding or <br /> removal of Waste. <br /> 2. One 55 gallon container of rollform coolant. <br /> Corrections: <br /> The Fabrication Department(Foremen, Leadmen, and Rollform Operators)was <br /> informed that the Containers must have the Lid on at all time except when adding or <br /> removal of Waste. <br /> B. Finishing: <br /> 1. Two 5 gallon containers of wash tank sludge. <br /> Corrections: <br /> The Finishing Department(Foremen, Leadmen)was informed that the Containers <br /> must have the Lid on at all time except when adding or removal of Waste. <br /> Effective immediately keep all containers of hazardous waste closed except when <br /> adding or removing waste. <br />