My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
1029
>
2200 - Hazardous Waste Program
>
PR0220080
>
COMPLIANCE INFO_1989-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 5:14:14 PM
Creation date
4/27/2020 12:24:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2003
RECORD_ID
PR0220080
PE
2249
FACILITY_ID
FA0000132
FACILITY_NAME
CORONADO STONE PRODUCTS
STREET_NUMBER
1029
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04534012
CURRENT_STATUS
02
SITE_LOCATION
1029 S SACRAMENTO ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2249_PR0220080_1029 S SACRAMENTO_1989-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />22 <br />(b) The owner or operfitor may amend his closure plan at any time <br />during the active life of the facility. (The active life of <br />the facility is that period during which wastes are periodi- <br />cally received.) The owner or operator shall amend his plan <br />any time changes in operating plans or facility design affect <br />the closure plan. <br />owner or operator shall submit his closure plan to the <br />RegionalCalifornia Quality ControlBoard at least <br />days before the date he expects to begin closure. The <br />California Regional <br />_ i .: QualityControl Boardwill modify, <br />approve, or.disapprove the plan within 90 days of receipt and <br />after providing the owner or operator and the affected public <br />(through a newspaper notice) the opportunity to submit written <br />comments. <br />3. Time allowed for closure. <br />(a) Within 90 days after receiving the final volume of hazardous <br />wastes, the owner or operator shall treat all hazardous <br />wastes in storage or in treatment, or remove them from the <br />site, or dispose of them on-site, in accordance with the <br />approved closure plan. <br />(b) The owner or operator shall complete closure activities in <br />accordance with the approved closure plan and within six <br />months after receiving the final volume of wastes. The <br />California Regional Water Quality Control Board may approve <br />a longer closure period under Item 2 (c) if the owner or <br />operator can demonstrate that: (1) the required or planned <br />closure activities will, of necessity, take him longer than <br />six months to complete, and (2) that he has taken all steps <br />to eliminate any significant threat to human health and the <br />environment from the unclosed but inactive facility. <br />4. Disposal or decontaminationequipment. <br />When closure is completed, all facility equipment and structures <br />shall have been properly disposed of, or decontaminated by removing <br />all hazardous waste and residues. <br />5• Certification of closure. <br />When closure is completed, the owner or operator shall submit to <br />the California Regional Water Quality Control Board certification <br />both by the owner or operator and by an independent registered <br />professional engineer that the facility has been closed in accor- <br />dance with the specifications in the approved closure pian. <br />
The URL can be used to link to this page
Your browser does not support the video tag.