My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
1029
>
2200 - Hazardous Waste Program
>
PR0220080
>
COMPLIANCE INFO_1989-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 5:14:14 PM
Creation date
4/27/2020 12:24:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2003
RECORD_ID
PR0220080
PE
2249
FACILITY_ID
FA0000132
FACILITY_NAME
CORONADO STONE PRODUCTS
STREET_NUMBER
1029
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04534012
CURRENT_STATUS
02
SITE_LOCATION
1029 S SACRAMENTO ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2249_PR0220080_1029 S SACRAMENTO_1989-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br />W <br />1. Cost estimate for facility closure. <br />(a) The owner or operator shall have a written estimate of the <br />cost of closing the facility in accordance with the applicable <br />closure requirements of this document. The owner or operator <br />shall keep this estimate, and all subsequent estimates, at the <br />facility. The estimate shall equal the cost of closure at the <br />point in the facility's operating life when the extent and <br />manner of its operation would make closure the most expensive, <br />as indicated by its closure pian. <br />(b) The owner or operator shall prepare a new closure cost estimate <br />whenever a change in the closure plan affects the cost of <br />closure. <br />(c) On each anniversary of the effective date of this document, <br />the owner or operator shall adjust the latest closure cost <br />estimate using an inflation factor derived from the annual <br />Implicit Price Deflator for Gross National. Product as published <br />by the U.S. Department of Commerce in its Survey of Current <br />Business. The inflation factor shall be calculated by dividing <br />the latest published annual Deflator by the Deflator for the <br />previous year. The result is the inflation factor. The adjusted <br />closure cost estimate shall equal the latest closure cost esti- <br />mate (see Item 1(b)) times the inflation factor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.