Laserfiche WebLink
Ground Zero Analysis, Inc. <br />SITE SAFETY PLAN <br />The buddy system must be used on all GZA hazardous waste sites. <br />Site will be secured as follows: Cones will delineate a 20 -foot work area and non-essential <br />personnel will not be allowed within the work area. <br />Work Zones will be marked as follows: Barricades and/or caution tape will be used to mark off work <br />zone. <br />MARK WORK ZONES ON SITE MAP O CHECK WHEN DONE. <br />On-site communications: ❑ Radio El Verbal ❑ Hand Signals <br />❑ Other <br />Designate hand signals here: <br />Site Control and Communications (Continued) <br />Off-site communications: ❑ Radio El Telephone <br />❑ Other <br />The specific signal for an emergency is: Verbally Given <br />The specific signal for an evacuation is: Verbally Given <br />Evacuation assembly point is: Southwest corner of the facility entrance and Jones Avenue <br />MARK EVACUATION ROUTE(S) ON SITE MAP L7 CHECK WHEN DONE <br />C010F.1101 oil 1 / <br />Personnel Decontamination Procedure: <br />All contaminated personal protective equipment (i.e., gloves coveralls) will be placed in DOT <br />approved drums along with the drill cuttings. <br />Location of Wash Water. At site. <br />Location of Toilet. At site. <br />Location of Drinking Water. <br />PAGE 8 <br />