Laserfiche WebLink
Ground Zero Analysis, Inc. <br />SITE SAFETY PLAN <br />MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN DONE <br />Equipment Decontamination Procedure: <br />Materials to be Disposed of as Hazardous Waste: <br />Equipment that is not disposable will be <br />pressure washed or cleaned with an Alconox° <br />solution and triple rinsed. <br />Soil, decontamination water, and purge water <br />generated during this investigation will be <br />temporarily stored on-site in 55 -gallon DOT <br />approved steel drums until proper disposal is <br />arranged. <br />In case of an emergency the branch/corporate safety officer must be notified by the site safety officer <br />or project manager. The site safety officer or her/his alternate will notify outside emergency response <br />agencies (ER) as needed, the branch/corporate safety officer, and the project supervisor/manager. <br />The branch/corporate safety officer will make any required reports to local, state, and federal <br />agencies. Other emergency notifications will include: <br />ER Agency: <br />Fire/Police Depts. <br />Phone: <br />911 <br />ER Agency: <br />Ambulance <br />Phone: <br />911 <br />Site Safety Officer: <br />Joe Vasquez <br />Mobile Phone: <br />209/244-5601 <br />Site Safety Alternate: <br />Eric L. Price <br />Office Phone: <br />Mobile Phone: <br />209/838-9888 <br />209-380-8046 <br />Corporate Safety Manager: <br />Eric L. Price <br />Office Phone: <br />209/838-9888 <br />Project Manager: <br />Greg Stahl <br />Office Phone: <br />Pager No. <br />209/838-9888 <br />Other: Client Representative <br />Office Phone: <br />Employees may only fight small fires, which have not spread beyond the original source. Spills may <br />be cleaned up by properly prepared personnel as follows. <br />Spilled Material Neutralizer PPE Monitoring <br />PAGE 9 <br />