Laserfiche WebLink
/-kmu Hpprovea ium—rleaiy r-nase n cvK oysiem—vK-.eu 0-H kyuu r4ozziel rage i <br /> procee step 1.1.8. Any nozzle,that disp es fuel with the mini-boot in a <br /> free state condition must be repaired or replaced. <br /> 1.1.8 Verify that the nozzle will dispense fuel when the dispenser is authorized and <br /> the nozzle spout is inserted into a vehicle fill-pipe to a position 1/8" short of <br /> locking the spout anchor ring over the rim of the fill-pipe opening or manually <br /> held back while dispensing into an approved container. Any nozzle that does <br /> not dispense fuel must be repaired or replaced. <br /> 1.2 Healy Part No. 8014 Spout Replacement <br /> 1.2.1 Remove the Mini-Boot using the procedure from Section 1.1. <br /> 1.2.2 Use a Phillips Screwdriver to remove the # 8 pan head Spout Screw & O-ring, <br /> (see Sections 1.7 & 1.8, Item 14) holding the spout in place. <br /> 1.2.3 With the screw removed, using a maximum twisting motion of 150 degrees in <br /> each direction, separate the nozzle body and the spout. Be sure that the 3 0- <br /> rings from the discarded spout assembly do not remain in the nozzle body. <br /> There is a 4th O-ring, furthest from the opening that remains inside the nozzle. <br /> Leave this O-ring in place. <br /> Installing the New Spout Assembly <br /> 1.2.4 Install the new (pre-lobed) 0-rings that are provided with the Healy Part No. <br /> 8014 Replacement Spout on the new spout assembly. <br /> 1.2.5 Carefully insert the spout into the nozzle, lightly pushing together until the <br /> spout aligns itself and resistance is felt. Using a maximum twisting motion of <br /> 150 degrees and light pressure, slide the pieces together, seating the o-rings <br /> and aligning the screw threads in the spout housing with the hole in the nozzle <br /> casting. <br /> 1.2.6 Install the new # 8 Panhead Spout Screw & O-Ring, (provided with the Healy <br /> Part No. 8014 Replacement Spout), and tighten securely to 12 inch pounds. <br /> 1.2.7 Install the Mini-Boot and test nozzle operation using the procedure from <br /> Sections 1.1.3 through 1.1.8. <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax 603.882.5189 <br /> Healy Systems, Inc. —the innovative leader of Stage 11 vapor recovery equipment <br />