Laserfiche WebLink
Hr%b Hpprovea ivivi—rleaiy r-nase a cvr% system—vK-zu i-H kwu ivozziel rage y <br /> 1.3.5 Install t ini-Boot and test nozzlq operatioaLing the procedure from <br /> Sections 1.1.3 through 1.1.8. <br /> 1.4 Healy Part No. 469 Handle Cover Replacement <br /> 1.4.1 Grasp the lower edges of the Handle Cover (see Sections 1.7 & 1.8, Item 6) <br /> and pull the cover off with an upward motion. <br /> 1.4.2 Installation is the reverse of this procedure. Be sure the pointed wings on the <br /> front of the cover are slid under the Scuffguard. <br /> 1.5 Healy Part No. 6358 Handguard Replacement <br /> 1.5.1 This is best done with the nozzle detached from the hose. The front and rear <br /> guard pins must be removed. Back up the head side of the pin with a suitable <br /> socket and drive out the guard pins using a 3/32" drive pin punch or <br /> equivalent. The spring-loaded hold-open clip will pop out when the rear pin is <br /> removed. Be sure to observe the orientation of the spring so it can be properly <br /> reinstalled. <br /> 1.5.2 Remove the Handguard (see Sections 1.7 & 1.8, Item 10) carefully. The lever <br /> will drop down and the lever pivot pin will be free and could possibly slide out. <br /> Place the new Handguard into position and install a new front guard pin <br /> (Figure 1, Item 13) through the Handguard. Do not peen at this time. <br /> 1.5.3 Position the hold-open clip (see Sections 1.7 & 1.8, Item 7) over the <br /> handguard. Insert a new rear guard pin (see Sections 1.7 & 1.8, Item 8) <br /> through one ear of the clip. handguard and approximately 1/8" through the <br /> casting. Slide the coil spring (see Sections 1.7 & 1.8, Item 9) into position with <br /> the "hook" on the hold-open clip. Push in the spring so the pin passes through <br /> the coil and into the other ears on the casting, handguard and clip. Be sure <br /> the hold-open clip is installed properly before peening-over the free ends of <br /> the two pins. <br /> 1.6 Healy Part No. 6130-4 Lever Replacement <br /> 1.6.1 Remove the Handguard using the instructions in Section 1.5 to expose the <br /> Lever. There is a washer around the plunger under the Lever. Observe how <br /> these are installed and be sure to re-use them with the new Lever. <br /> 1.6.2 With the Lever released, the white plunger will pull back towards the casting <br /> and make it difficult to re-install the pin on a new Lever. Use a small <br /> screwdriver to reach through one mounting hole in the new Lever and engage <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax 603.882.5189 <br /> tw"l <br /> Healy Systems, Inc. —the innovative leader of Stage II vapor recovery equipment <br />