My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:24:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer 0 Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: 0 Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # 87 Piping Run # 91 Piping Run # Diesel Piping Run # <br /> "PipingMate6al:M FG FG FG <br /> Piping Manufacturer: UK UK UK <br /> Piping Diameter: 4" 4" 4" <br /> Length of Piping Run: 45' 40' 60' <br /> Product Stored: Reg. Prem. Diesel. <br /> Method and location of piping- <br /> run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 09:40 09:40 09:40 <br /> Initial Reading(Ri): 5 psi 5 psi 5 psi <br /> Test End Time: 10:40 10:40 10:40 <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 <br /> Test Result: ®Pass-0 Fait ;%; ®Pass D Fail, ®Pass. ® Fail ®Pass 0 Taal <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.