My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NOWELL
>
26500
>
3500 - Local Oversight Program
>
PR0545613
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:39:03 PM
Creation date
4/27/2020 3:33:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545613
PE
3528
FACILITY_ID
FA0005466
FACILITY_NAME
LOPEZ, PAM
STREET_NUMBER
26500
STREET_NAME
NOWELL
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
02
SITE_LOCATION
26500 NOWELL RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 %Moe <br /> remove sediments from the well pack and casing. At the conclusion of development, water <br /> 4.0 levels will again be measured. <br /> #A. Groundwater Monitoring <br /> Subsequent to construction and development, groundwater-monitoring-wells will be sampled. <br /> �. If periodic groundwater monitoring is required by the lead regulatory agency, each monitoring <br /> well will be sampled, according to a proposed or specified sampling schedule (i.e., monthly or <br /> quarterly), thereafter. <br /> Groundwater-Elevation Measurements <br /> Groundwater levels will be measured in each of the monitoring wells prior to each sampling <br /> event. Groundwater levels will be measured prior to purging and subsequent to sampling. <br /> �. Groundwater data, collected either prior to initiation of the quarterly sampling, or at least 72 <br /> hours subsequent to sampling, will be used in evaluating groundwater-flow direction and <br /> gradient. <br /> The groundwater level in each well will be measured using a Solinst, electronic depth <br /> sounding device, or equivalent water-level indicator. The depth-to-water measurement <br /> +-� provided by the depth sounding device will be referenced to a previously surveyed reference <br /> point on the well head. The resulting groundwater surface elevation will be recorded. Depth <br /> and elevation measurements will be reported on the sampling-logs to the nearest 0,01 foot. <br /> Instrumentation introduced into the well for the purpose of measuring water levels or depths <br /> of wells will be decontaminated prior to, and subsequent to, introduction to each well. <br /> Decontamination procedures are outlined in Equipment Decontamination. <br /> Well-Depth Measurements <br /> The total depth of each well will be measured subsequent to each sampling event. Total <br /> depth will be measured using a weighted tape (or electronic sounding device) referencing the <br /> surveyed reference point on the well head. <br /> Groundwater Sampling <br /> Groundwater samples collected from monitoring wells as required by the lead agency, will be <br /> �. sampled in order of known, ascending contaminant concentrations. <br /> Purging of Monitoring Wells <br /> The wells will be purged prior to sampling to remove water from the well casing and <br /> formation surrounding the well screen which may have undergone chemical/physical alteration <br /> WorWou SON-0740MO-Pxvhea JL=1M SOP 3 -2 <br /> Lr <br /> a� &Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.