My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NOWELL
>
26500
>
3500 - Local Oversight Program
>
PR0545613
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:39:03 PM
Creation date
4/27/2020 3:33:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545613
PE
3528
FACILITY_ID
FA0005466
FACILITY_NAME
LOPEZ, PAM
STREET_NUMBER
26500
STREET_NAME
NOWELL
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
02
SITE_LOCATION
26500 NOWELL RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
through exposure to the atmosphere. Equipment used for purging will be thoroughly <br /> decontaminated between wells, and equipment rinsate samples would be collected as <br /> appropriate. Each well will be purged of at least four well volumes (well volume based on <br /> inside diameter of casing), or until measurements of pH, temperature, and specific electric <br /> conductivity (EC) have stabilized (pH constant within 0.1, temperature, constant within I" <br /> Celsius, and EC within 10% of previous measurement). Specific conductance and pH meters <br /> will be calibrated at least once each day they are used. Purged monitoring-well water will be <br /> stored in 55-gallon drums. <br /> . Groundwater-Sampling Apparatus <br /> After completion of purging, groundwater samples will be drawn from the monitoring wells <br /> using cleaned Teflon bailers lowered partially through the groundwater surface, or with <br /> electrical submersible pumps or bladder pumps. Discharge rates during sampling will <br /> approximate 0.3 gallons per minute. Clean latex gloves will be worn during the sampling <br /> process. <br /> i <br /> i <br /> L � <br /> L <br /> i <br /> work;,.n sora-("400M-xe�isaa J"19" SOP 3 -3 <br /> &Associates <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.