i:. 4ol %W/ <br /> w- SOP 3 - GROUNDWATER MONITORING WELL CONSTRUCTION <br /> Drilling and well completion will be observed by a geologist or engineer under the <br /> �- supervision of Licensed Engineer or Geologist. <br /> Monitoring-Well Locations and Depths <br /> Monitoring-well locations, depths and screened intervals will be proposed in a Workplan <br /> Addendum. <br /> Monitoring-Well Materials and Specifications <br /> Monitoring wells will be constructed with Schedule 40, two-inch (inside diameter), poly vinyl <br /> chloride (PVC) casing. Flush-joint well casing will be utilized, and no chemical cements or <br /> solvents will be used in the construction of the wells. The top of each well casing will be <br /> covered with a locking watertight plug, and a threaded PVC plug will be installed at the <br /> low bottom of each well. <br /> The screened interval of each well will consist of Schedule 40, machine-slotted PVC well <br /> screen, with 0.020-inch slots. The well screen will extend from approximately 5 feet above <br /> the observed groundwater level to the maximum depth of each monitoring-well boring (10 <br /> feet below the groundwater surface) to accommodate expected fluctuation in water levels. <br /> �., The annular space of each well will be packed with a No. 2/12 size sand to approximately <br /> two feet above the perforations. A two foot thick bentonite seal will be placed above the <br /> sand and hydrated with potable water to provide a filter media between the well pack and <br /> r►. surface seal. The remaining annulus will be backfilled with neat cement grout to within <br /> approximately one foot of the existing grade. Well casing, sand, and bentonite will be placed <br /> through the center of the hollow-stem auger. Grout backfill will be placed through the center <br /> �- of the augers or tremmied from the bentonite seal to within one foot of the ground surface. <br /> The exception would be for those wells where the total depth of grout is less than 25 feet and <br /> where grout will not be placed in groundwater. In this case, the grout will be allowed to <br /> free-fall from the top of the well-boring. <br /> Water and dust-resistant steel utility boxes with either PVC or galvanized steel skirting will <br /> be placed over the well casing. The boxes will be set in place with concrete approximately <br /> 1/2-inch above the surrounding grade. The top of each well casing will be surveyed relative <br /> to a local USGS or temporary benchmark, as appropriate. <br /> Monitoring-Well Development <br /> Prior to development, water levels will be measured in each well. Water from each well will <br /> be sampled for odor, color and clarity by lowering a clear Teflon bailer partially through the <br /> groundwater interface. Wells will be developed using bailers, surge blocks, and pumps to <br /> WorWan SOPc-014MB-May.1995 SOP 3 —1 <br /> &Associates <br />