Laserfiche WebLink
General Description of Approach <br /> I. Construct a groundwater drainage system adjacent to the East send, (former <br /> tank location) of the forklift shop. <br /> 2. Boiremediate soils removed during installation of drainage system. <br /> 3. Cover/Pave or otherwise make impervious, currently exposed soils on the East <br /> end of the forklift shop. <br /> 4. Sample and evaluate water from monitoring wells and groundwater drain. <br /> 5. Develop Monitoring plan and groundwater treatment plan. <br /> 6. Proceed with remediation. <br /> 7. After adequate remediation seek closure., <br /> Comments Appreciated <br /> Tri Valley Growers would like to reach an agreement, with San Joaquin <br /> Environmental Health, on a remediation approach before further plans and funds are <br /> expended. After your review of the enclosed perhaps a meeting would be <br /> appropriate. <br /> Should you have any questions please feel free to contact me or my supervisor, (Juan <br /> Quijano, Phone 572-5516): <br /> Sincerely, <br /> Bob Bennett Phone (209) 572-5564 <br /> Fax (209) 572-5298 <br /> Environmental Services Supervisor <br /> Tri Valley Growers <br /> 1 <br /> Page 2 <br /> P.O.Boa 7114, Ba .5 .,San Fmncisw, California 94120.7114 Phone., 41 40-1600 Telex:27-9146 Fax.-(4L9 445-1628 l <br /> S <br /> f <br />