Laserfiche WebLink
CROSS REFERENCE MATRIX FOR ONSHORE NON-PRODUCTION FACILITIES <br /> Page <br /> Regulation Description Pagag <br /> §112.8(d), <br /> §112.12(d) Facility transfer operations,pumping and facility process 15 <br /> §112.8(d)(1), Buried piping installed or replaced after 8/16/02 corrosion 15 <br /> §I 12.12(d)(1) protected <br /> §112.8(d)(2), Terminal connections capped/blank flanged when not in 15 <br /> §112.12(d)(2) service or in standby service for an extended time <br /> §112.8(d)(3), pipe supports properly designed 15 <br /> §112.12(d)(3) <br /> §112.8(d)(4), Inspect aboveground piping,integrity and leak test buried 15 <br /> §112.12(d)(4) piping <br /> §112.8(d)(5), <br /> §112.12(d)(5) warn vehicles of aboveground piping 15 <br /> §112.20 Facility Response Plan 16 <br /> §112 Appendix C Completed and signed certification of substantial harm form 15 <br /> vii <br /> :.1i CONDOR <br />